BLD16-00869
| FIRE-Conference | 6/10/2016 | 6/10/2016 | 6/10/2016 12:33:40 PM | P | DONE |
|
|
I spoke to Phil about not allowing a "ok to cover" until the combustible concealed wall cavities had been addressed with additional sprinkler protection or meeting another section of code in NFPA 13.
|
FIR16-00324
| INSP-Final Inspection | 6/10/2016 | 6/10/2016 | 6/10/2016 12:32:18 PM | P | PASS |
|
|
Permit finaled. Overhead hydro test passed
|
FIR16-00131
| INSP-Supply line flush | 6/6/2016 | 6/10/2016 | 6/10/2016 11:17:56 AM | A | CANC |
|
|
Rick Phone #: ###-####
|
BLD16-01066
| FIRE-Final Inspection | 6/9/2016 | 6/10/2016 | 6/10/2016 10:47:19 AM | A | PASS |
|
|
Life safety passed
|
BLD16-02022
| FIRE-Final Inspection | 6/9/2016 | 6/10/2016 | 6/10/2016 8:27:08 AM | A | PASS |
|
|
Life safety passed
|
BLD16-01912
| FIRE-Final Inspection | 6/8/2016 | 6/10/2016 | 6/10/2016 8:08:06 AM | A | FAIL |
|
|
Inspection turned into a conference. Contractor needs to repair and test all of the existing emergency lights and exit signs in the paths of egress. Also a fire sprinkler permit needs to be issued for all of the sprinkler work needed for the new rooms and demizing wall.
|