Inspections for the day of: Monday, June 10, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-02111 Temporary Service6/10/20196/10/20196/10/2019 2:56:57 PMPPASS
Phone #: ###-#### Inspection requested via web by Robert Murray...
t/s u/g new ok
ELE19-02112 Temporary Service6/10/20196/10/20196/10/2019 2:56:31 PMPPASS
Phone #: ###-#### Inspection requested via web by Robert Murray...
t/s u/g new ok
ELE19-02053 Final6/5/20196/10/20196/10/2019 2:04:49 PMPCANC
For re energize, Please call Brodie with any questions Phone #: ###-#### Inspection requested via web by William Salts...
must request perm service before final
must have power restored before final
ELE19-02053 Rough-In Permanent Service6/10/20196/10/20196/10/2019 2:03:52 PMPPASS
For re energize, Please call Brodie with any questions Phone #: ###-#### Inspection requested via web by William Salts...
All-in-one added outside...interior panel will be converted to junction box-cover sealed shut
grounding brought up to code
p/s o/h reconnect ok
ELE19-02107 Final6/10/20196/10/20196/10/2019 1:26:35 PMPPASS
call Dustin with questions ###-#### Phone #: ###-#### Inspection requested via web by A.M.E. Office...
surface work using existing circuits
rigid conduit and sealtite material
disconnects and labelling complete
ok to final
ELE18-04342 Final6/10/20196/10/20196/10/2019 1:24:34 PMPPASS
call Dustin with questions ###-#### Phone #: ###-#### Inspection requested via web by A.M.E. Office...
all work done on surface using PVC conduit, junction boxes, and W/P service outlet-GFCI with inuse cover...ok to final
ELE19-02099 Temporary Service6/10/20196/10/20196/10/2019 12:41:25 PMPPASS
Phone #: ###-#### Inspection requested via web by Greg Traudt...
t/s u/g new ok
ELE19-02085 Electrical Rough-In6/7/20196/10/20196/10/2019 12:07:21 PMAPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...
underground ok to cover...floor boxes
ELE19-01495 Final6/10/20196/10/20196/10/2019 11:24:51 AMPCANC
Final inspection for cell site.
Contact Alex Ybarra
Thank you Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
ELE19-01916 Electrical Rough-In6/7/20196/10/20196/10/2019 10:01:27 AMAPASS
Trent Phone #: ###-####....
rough complete ok to cover
discussed outlet location on island, small appliance circuit used for countertop island and using existing micro circuit for micro on island
ELE19-02070 Electrical Rough-In6/7/20196/10/20196/10/2019 9:35:54 AMAPASS
please call jake ###-#### he is not on site he is in eagle. Panels removed except a 8 panel row to show clamping. Phone #: ###-#### Inspection requested via web by Ashley Rasmussen....
UL listed equipment verified
line side tap in panel
ELE19-00533 Final6/9/20196/10/20196/10/2019 8:59:34 AMAPASS
Phone #: ###-#### Inspection requested via web by Steven Burch...ok to final
ELE19-00930 Final6/7/20196/10/20196/10/2019 8:37:35 AMAPASS
Garage code 4053. Shows additional fees to be paid, but it has not been added to my cart to make a payment online. Once added it will be paid right away. Phone #: ###-#### Inspection requested via web by Dean Gernaat...
correction made...ok to final