BLD01-00517
| BLD-Aging Inspection | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | | PASS |
|
|
demo complete 6/11/2001 7:53:39 AM
|
BLD01-00858
| BLD-Aging Inspection | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | | PASS |
|
|
called owner 6/11/2001 11:35:38 AM
|
BLD01-00327
| BLD-Aging Inspection | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | | PASS |
|
|
wip 6/11/2001 10:14:12 AM
|
BLD01-00584
| BLD-Aging Inspection | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | | PASS |
|
|
no call, probably done as this is Ada Co. Court address 6/11/2001 7:55:33 AM
|
BLD01-00593
| BLD-Aging Inspection | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | | FAIL |
|
|
no call... 6/11/2001 10:13:08 AM
|
BLD00-02375
| BLD-Conference | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 6/11/2001 10:06:37 AM conf. w/ Wendall & Lombac Const...need site insp to verify shafts/framing.
|
BLD01-01079
| BLD-Framing/Rough-in | 6/8/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | A | FAIL |
|
|
justin ###-####; complete fireblocks & drop lid for r/a chase 6/11/2001 10:19:05 AM
|
BLD01-00677
| BLD-Framing/Rough-in | 6/8/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | A | PART |
|
|
howard-- ###-#### fr insp prior frame insp by 301?? insul complete 6/11/2001 11:47:09 AM
|
BLD99-03148
| BLD-Framing/Rough-in | 6/8/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | A | FAIL |
|
|
###-####; see c/n...firstops, dropped 1hr lid, dampers? 6/11/2001 4:16:18 PM
|
BLD00-03658
| BLD-Final | 6/7/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | FAIL |
|
|
Deliah ###-####; fire...? called told to re call to office & contact Rick 6/11/2001 4:20:14 PM
|
BLD01-00223
| BLD-Energy code compliance | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-00223
| BLD-Framing/Rough-in | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | PASS |
|
|
|
BLD01-00858
| BLD-Final | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | PASS |
|
|
Allen nguyen ###-#### card to owner /l/c only 6/11/2001 12:17:17 PM
|
BLD00-02347
| BLD-Final | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | PASS |
|
|
Final - Joe, ###-####, c/n ok 6/11/2001 4:35:48 PM
|
MEC01-01704
| Rough-in | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | FAIL |
|
|
###-#### c/n conne ducts/extensions 6/11/2001 12:16:39 PM
|
BLD00-02175
| BLD-Conference | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 6/11/2001 2:18:03 PM w/ Sam Rogers...req'd exit should be ok if doorstop made permanent or appropriate method of blocking or coordinating door swing at "conflicting" doors to exterior
|
BLD00-02175
| BLD-Final | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 6/11/2001 4:25:41 PM Per UBC 1007 .2.5. install panic or "3-point" latch,(or approved equal) c/n issued to Peter Schott; also need permanent door stop from bsmt/banquet rm. exit
|
BLD00-01649
| BLD-Conference | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 6/11/2001 4:40:30 PM re floor boxes w/ eng's " judgement "...install as per detail shown
|
BLD00-01649
| BLD-Framing/Rough-in | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | PART |
|
|
firestop for floor mel ###-#### boxes, maintain engs detail 6/14/2001 3:19:37 PM
|
BLD01-00896
| BLD-Framing/Rough-in | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | FAIL |
|
|
Tim, ###-#### - reinspection complete c/n 6/11/2001 12:15:26 PM
|
BLD01-00896
| BLD-Energy code compliance | 6/11/2001 | 6/11/2001 | 6/11/2001 12:00:00 AM | P | FAIL |
|
|
Tim, ###-####; complete insul & c/n, 2nd c/n issued...complete elec, strap plbg 6/11/2001 12:15:40 PM 6/11/2001 12:16:19 PM
|