Inspections for the day of: Tuesday, June 11, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00944 BLD-Framing/Rough-in6/10/20026/11/20026/11/2002 12:00:00 AMAPASS
###-#### CHAD
BLD02-01180 BLD-Foundation6/10/20026/11/20026/11/2002 12:00:00 AMAPASS
###-#### dave 6/11/2002 12:17:47 PM 6/11/2002 12:20:20 PM
BLD02-00431 BLD-Footing6/10/20026/11/20026/11/2002 12:00:00 AMAPART
kim ###-#### ft Footing for E wall E 1/2 of S wall and E 1/2 of N wall ....Pending MTI insp and approvals. 6/11/2002 12:11:09 PM 6/11/2002 12:19:46 PM
BLD02-00713 BLD-Conference6/10/20026/11/20026/11/2002 12:00:00 AMAPART
TIM ###-#### Special insp Req (concrete) or letter from Eng spec design strength 2500psi 6/11/2002 11:02:43 AM
MEC02-01470 Rough-in6/10/20026/11/20026/11/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/10/2002 at 16:44:13. Contact: ###-####.
BLD02-01244 BLD-Footing6/11/20026/11/20026/11/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/11/2002 at 06:40:30. Contact: ###-####.
BLD02-00679 BLD-Framing/Rough-in6/10/20026/11/20026/11/2002 12:00:00 AMAFAIL
fr steve- ###-#### C/N posted. 6/11/2002 12:02:08 PM
BLD02-01363 BLD-Footing6/10/20026/11/20026/11/2002 12:00:00 AMAPASS
###-#### DAVE
BLD00-02553 BLD-Final6/10/20026/11/20026/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/10/2002 at 11:38:28. Contact: ###-####. C/C issued. 6/11/2002 3:51:21 PM
BLD02-00733 BLD-Framing/Rough-in6/10/20026/11/20026/11/2002 12:00:00 AMPFAIL
JUSTAN ###-#### C/N 6/11/2002 3:58:13 PM
MEC02-01438 Rough-in6/11/20026/11/20026/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/11/2002 at 08:12:45. Contact: ###-####. Final OK 6/11/2002 1:49:28 PM
BLD02-00995 BLD-Final6/11/20026/11/20026/11/2002 12:00:00 AMPPASS
###-#### C/C issued. 6/11/2002 3:50:55 PM
MEC02-01221 Final6/11/20026/11/20026/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/11/2002 at 09:39:59. Contact: ###-####.
BLD02-00950 BLD-Framing/Rough-in6/11/20026/11/20026/11/2002 12:00:00 AMPPASS
JOH N ###-####
BLD02-00950 BLD-Energy code compliance6/11/20026/11/20026/11/2002 12:00:00 AMPPASS
JOH N ###-####