ELE02-01699
| Rough-In Permanent Service | 6/6/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | A | PASS |
|
|
steve ###-#### p/s ug n ok box under spa tub not secured/survey 6/11/2002 11:24:46 AM
|
ELE02-01238
| Electrical Rough-In | 6/10/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | A | FAIL |
|
|
r/i dustin ###-#### correction not made / called 6/11/2002 9:53:38 AM
|
ELE02-01733
| Electrical Rough-In | 6/10/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | A | PASS |
|
|
for conf leon- ###-####
|
ELE02-01739
| Electrical Rough-In | 6/10/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | A | PASS |
|
|
conf only kevin ###-####
|
ELE02-01086
| Electrical Rough-In | 6/10/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | A | PASS |
|
|
cover insp on main floor brandon- ###-####
|
ELE02-01744
| Permanent Service | 6/11/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | P | PASS |
|
|
chuck ###-#### per ser p/s ug n ok 6/11/2002 2:20:15 PM
|
ELE02-01465
| Final | 6/11/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | P | PASS |
|
|
CHRIS ###-####
|
ELE02-01453
| Final | 6/11/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | P | PASS |
|
|
LARRY ###-####
|
ELE02-01626
| Electrical Rough-In | 6/11/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | P | PART |
|
|
slab insp- dan cell ###-#### slab covered /could not see anything 6/11/2002 2:58:42 PM
|
ELE01-01366
| Final | 6/10/2002 | 6/11/2002 | 6/11/2002 12:00:00 AM | P | NH |
|
|
Scheduled by a contractor via Hello! on 06/10/2002 at 15:29:38. Contact: ###-####.
|