MEC03-01499
| Final | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
|
MEC03-01449
| Final | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
|
MEC03-00708
| Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PART |
|
|
all 1st floor done 6/11/2003 9:32:11 PM
|
MEC03-01482
| Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 6:28:06 AM. Contact: ###-####.
|
MEC03-01450
| Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/10/2003 at 11:05:00 AM. Contact: ###-####.
|
MEC03-01449
| Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/10/2003 at 11:06:00 AM. Contact: ###-####.
|
MEC03-01490
| Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PART |
|
|
gasline at fire place ok to cover, only thing looked at 6/11/2003 7:55:36 PM
|
MEC02-03179
| Conference | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | DONE |
|
|
Requesting final inspection of the mechanical heating system. Key for access is in black tube on back of sign near street. ; Phone #: ###-#### Internet Inspection Request from: Dean McKellip
|
MEC03-01495
| Final | 6/9/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | FAIL |
|
|
###-####
|
MEC03-00879
| Final | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
Please call Russ (the general contractor) at ###-#### when on the way. Also, request Alan do this inspection if possible due to some issues with the furnace platform on rough in. ; Phone #: ###-#### Internet Inspection Request from: Matt Hansen
|
MEC03-01114
| Pressure Test | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
Added a gas range!; Phone #: ###-#### Internet Inspection Request from: Sherri Petterson
|
MEC03-00705
| Final | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 8:49:31 AM. Contact: ###-####.
|
MEC03-01509
| Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | FAIL |
|
|
###-#### csst not as per manuf. 6/12/2003 1:05:41 AM
|
MEC03-01510
| Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | FAIL |
|
|
###-#### csst not as per manuf. 6/12/2003 1:05:51 AM
|
MEC03-01512
| Final | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
###-#### david
|
MEC03-01512
| Pressure Test | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | CANC |
|
|
###-#### david
|