PLM03-01667
| Plumbing Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/10/2003 at 8:33:29 PM. Contact: ###-####.
|
PLM03-01679
| Groundwork | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/10/2003 at 12:42:14 PM. Contact: ###-####.
|
PLM03-01699
| Sprinkler (Final) | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
CASS; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
PLM03-00528
| Water and/or Sewer | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PART |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore core drilling through side of existing man hole 6/11/2003 1:49:43 PM
|
PLM03-01705
| Plumbing Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 8:04:29 AM. Contact: ###-####.
|
PLM03-01696
| Sprinkler (Final) | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
###-#### brad
|
PLM03-01708
| Sprinkler (Final) | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
###-#### brad
|
PLM03-01709
| Plumbing Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 9:24:04 AM. Contact: ###-####.
|
PLM03-01711
| Plumbing Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM03-01187
| Plumbing Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PART |
|
|
###-#### JOSH start of 24 hr pressure test on med gas for room,s 519 & 520 and tub room on south side 6/11/2003 3:18:13 PM
|
PLM03-01717
| Water and/or Sewer | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
###-#### ken water line only
|
PLM03-01275
| Groundwork | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PART |
|
|
don; Phone #: ###-#### Internet Inspection Request from: Annette Moore south side of middle section test ok ok to cover 6/11/2003 2:53:03 PM
|
PLM03-00696
| Final | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PART |
|
|
need to be corrected for final 1- provide a R.P. for make-up water to boiler 2-need to provide access and clearance for existing R.P. need to move out away from wall for maintenance and repair 3- need to provide identification sign,s for hydrant,s on west side of building and in north wash bay as potable water 4- may need to provide a non-potable water source for pressure washer 6/11/2003 4:47:19 PM
|