FIR03-00068
| INSP-Sprinkler Rough-in/Hydro | 6/9/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 8:25:40 AM. Contact: ###-####. EQ's not attached to beams and attached to interior walls 6/11/2003 12:30:09 PM
|
FIR03-00182
| INSP-Alarm Testing | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
Rick can we do this this afternoon? Say around 1:00 PM? Call me if this will not work. Thanks Mike.; Phone #: ###-#### Internet Inspection Request from: Mike Timmerman
|
FIR03-00183
| INSP-Alarm Testing | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
Rick can we do this at the same time as we do suite 425? This one is very quick. Call me if there is a conflict.
Thanks Mike; Phone #: ###-#### Internet Inspection Request from: Mike Timmerman
|
FIR03-00301
| INSP-Final Inspection | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 11:21:03 AM. Contact: ###-####.
|
FIR03-00068
| INSP-Sprinkler Rough-in/Hydro | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 11:29:08 AM. Contact: ###-####. 4th floor area B okay; main riser and standpipe in east stairwell is located in path of door and will have to relocated 6/11/2003 4:01:37 PM
|
BLD03-00739
| FIRE-Final Inspection | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
|
BLD03-00740
| FIRE-Final Inspection | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
|
BLD03-01134
| FIRE-Final Inspection | 6/6/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PART |
|
|
###-#### repair exit signa dn three fire sprinklers need canopies installed 6/11/2003 4:00:55 PM
|