MEC03-01436
| Pressure Test | 6/10/2003 | 6/11/2003 | 6/11/2003 11:37:34 AM | P | CANC |
|
|
Internet Inspection Request from: Sherri Petterson Inspection cancelled from web by: Sherri Petterson
|
MEC03-01436
| Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 11:37:29 AM | P | CANC |
|
|
Internet Inspection Request from: Sherri Petterson Inspection cancelled from web by: Sherri Petterson
|
MEC03-01451
| Final | 6/9/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | NH |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England left message on machine 6/11/2003 10:42:06 AM
|
MEC03-00648
| Final | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | NH |
|
|
Phone #: ###-#### Internet Inspection Request from: Sherri Petterson..farror..right on hickory 6/11/2003 9:32:27 AM left notice on door 6/11/2003 10:22:17 AM
|
MEC03-01345
| Final | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | FAIL |
|
|
###-#### lena venting covered with sheetrock 6/11/2003 2:12:24 PM
|
MEC03-01454
| Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | FAIL |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
MEC03-01454
| Pressure Test | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | FAIL |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
MEC03-01455
| Pressure Test | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
MEC03-01455
| Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | PASS |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
MEC03-00076
| Conference | 6/10/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | A | DONE |
|
|
meet john at 8:30...###-#### need clarification from engineer on venting and testing of oil storage tanks..need manuf specs on tanks 6/11/2003 9:12:57 AM
|
MEC03-01464
| Final | 6/5/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
###-####- DEBBIE
|
MEC03-01417
| Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 6:27:39 AM. Contact: ###-####.
|
MEC03-01452
| Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | NR |
|
|
test has been double checked & pumped up since 9am 6/11.. ready now; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL..###-#### frank 6/11/2003 2:23:15 PM meeting frank at 8:30 with plans for walk through 6/11/2003 4:13:03 PM
|
MEC03-00696
| Pressure Test | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser 5 psi on 60 lb test to all equip except drops to paint booths ok 6/11/2003 2:04:41 PM
|
MEC03-01163
| Final | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | FAIL |
|
|
bj; Phone #: ###-#### Internet Inspection Request from: Barbara Moore posted corrections at furn 6/11/2003 2:54:09 PM
|
MEC03-01511
| Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
###-#### bj
|
MEC03-01511
| Pressure Test | 6/11/2003 | 6/11/2003 | 6/11/2003 12:00:00 AM | P | PASS |
|
|
###-#### bj
|