Inspections for the day of: Wednesday, June 11, 2003.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02994 FIRE-Final Inspection6/10/20036/11/20036/11/2003 12:00:00 AMAFAIL
DAN; Phone #: ###-#### Knox box has been installed but there is still no map for the facp and I need nfpa 72 record of completions 6/11/2003 1:06:52 PM
BLD03-00920 FIRE-Final Inspection6/10/20036/11/20036/11/2003 12:00:00 AMAFAIL
Provide exit signs and emergency lights as per plans. provide hazardous materials stickers as per plan. provide max occupancy sign per plan 6/11/2003 10:31:43 AM
FIR03-00116 INSP-Final Inspection6/11/20036/11/20036/11/2003 12:00:00 AMAPASS
Hood suppression system operated correctly. Signals went to the alarm panel and to central station.
BLD02-02435 FIRE-Conference6/11/20036/11/20036/11/2003 12:00:00 AMPDONE
oil storage tank venting, John ###-#### I met with John with Debest plumbing and telephone conference with sam. There are no code requirements found for venting of the oil storage tanks to the outside of the facility. I did refer the contractor to the UFC 7902 minimum requirements for venting of any storage tank. 6/11/2003 2:29:38 PM
FIR03-00254 INSP-Sprinkler Rough-in/Hydro6/10/20036/11/20036/10/2003 10:43:17 AMPCANC
Scheduled by a contractor via Hello! on 6/10/2003 at 9:25:46 AM. Disp set to [CANC] by a contractor via Hello! on Jun 10 2003 10:43AM.