FIR07-00007
| FIR-Aging Inspection | 6/11/2007 | 6/11/2007 | 6/13/2007 1:00:23 PM | | DONE |
|
|
wip
|
FIR07-00463
| INSP-Final Inspection | 6/11/2007 | 6/11/2007 | 6/11/2007 9:17:22 PM | P | PASS |
|
|
Fire alarm work tested satisfactory, permit finaled.
|
FIR07-00179
| INSP-Final Inspection | 6/11/2007 | 6/11/2007 | 6/11/2007 9:15:46 PM | P | PASS |
|
|
Fire sprinkler passed final inspection, permit finaled.
|
FIR06-00985
| INSP-Sprinkler Rough-in | 6/7/2007 | 6/11/2007 | 6/11/2007 9:14:32 PM | P | PART |
|
|
Rough-in for building #2 is okay for cover, noted two areas where tenting needs to be adjusted-contractor to repair as agreed.
|
FIR06-00985
| INSP-Sprinkler Rough-in/Hydro | 6/7/2007 | 6/11/2007 | 6/11/2007 2:52:41 PM | P | PART |
|
|
AG hydrostatic test for building #2 passed.
|
FIR06-00602
| INSP-Final Inspection | 6/7/2007 | 6/11/2007 | 6/11/2007 1:31:42 PM | A | PASS |
|
|
All noted c/n items retested for verification of compliance, final building shell alarm testing completed satisfactory, need map at the panel as discussed and signage at the door to the FACP room to be verified at TI inspections.
|
BLD06-03197
| FIRE-Final Inspection | 6/8/2007 | 6/11/2007 | 6/11/2007 1:28:31 PM | A | PART |
|
|
Fire life safety is acceptable pending final of the project related fire sprinkler permit (need UG hydro and AG air tests).
|
FIR06-00504
| INSP-Sprinkler Rough-in | 6/8/2007 | 6/11/2007 | 6/11/2007 1:25:53 PM | A | PART |
|
|
OH rough-in for the dry system passed inspection, noted one missing seismic brace at the last piece of 3" main on the 1st floor, OH rough-in for the 3rd floor also completed including terraces, noted some wall changes within the suite spaces which will require some head spacing location mods.
|