Inspections for the day of: Wednesday, June 11, 2008.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-01470 Final6/11/20086/11/20086/11/2008 4:02:13 PMPPASS
the pump house is ready for the final
thanks Scott Phone #: ###-#### Internet Inspection Request from: Scott Abbott ok to final, no esc
ELE08-01489 Final6/11/20086/11/20086/11/2008 3:41:47 PMPPASS
Randy''s cell ###-#### Phone #: ###-#### Internet Inspection Request from: Randy Fletcher called contractor, ok to final, no esc
ESC08-00252 General Inspection6/11/20086/11/20086/11/2008 3:11:31 PMPPASS
looked ok
ESC08-00328 General Inspection6/11/20086/11/20086/11/2008 3:10:28 PMPPASS
looked ok
ESC08-00436 General Inspection6/11/20086/11/20086/11/2008 3:05:17 PMAPASS
looked ok
ESC08-00035 General Inspection6/11/20086/11/20086/11/2008 3:03:55 PMAPASS
looked ok
ELE08-01567 Electrical Rough-In6/11/20086/11/20086/11/2008 2:28:41 PMPPASS
pool bonding and light nitches Phone #: ###-#### Internet Inspection Request from: Lynn Cable pool bonding and light niches ok to cover, u/g pool to equipment ok to cover, no power or other u/g seen
ESC08-00415 General Inspection6/11/20086/11/20086/11/2008 1:54:41 PMPDONE
call to rp, needs to post yellow esc sign, he did not know that he was rp on this job, but will check it out
ELE08-01404 Final6/11/20086/11/20086/11/2008 1:47:27 PMPPASS
rod - pool Phone #: ###-#### called contractor, ok to final, no esc
ELE08-01564 Electrical Rough-In6/11/20086/11/20086/11/2008 1:16:24 PMPPASS
call for lock box combo//John ###-#### ric baths only ok, no esc
ELE08-01572 Electrical Rough-In6/11/20086/11/20086/11/2008 12:44:04 PMPPASS
Ufer inspection. Phone #: ###-#### Internet Inspection Request from: Kathy Smith concrete encased electrode ok to pour
ELE08-00406 Final6/10/20086/11/20086/11/2008 10:53:06 AMAPASS
joe Phone #: ###-#### ok to final, signed occupancy card
ELE08-01382 Final6/10/20086/11/20086/11/2008 10:21:17 AMPPASS
bill Phone #: ###-#### p/s o/h rec ok
ELE08-00899 Rough-In Permanent Service6/10/20086/11/20086/11/2008 9:31:02 AMPCANC
Scheduled by a contractor via Hello! on 6/10/2008 at 1:11:43 PM. Contact: ###-####. see conference
ELE08-00899 Conference6/11/20086/11/20086/11/2008 9:30:19 AMADONE
Scheduled by a contractor via Hello! on 6/10/2008 at 1:11:43 PM. Contact: ###-####. met electricians, told labels, address, panel schedules required before power can be turned on, no esc
ELE08-00898 Rough-In Permanent Service6/10/20086/11/20086/11/2008 9:27:54 AMACANC
Scheduled by a contractor via Hello! on 6/10/2008 at 1:09:53 PM. Contact: ###-####. see conference
ELE08-00898 Conference6/11/20086/11/20086/11/2008 9:27:17 AMADONE
Scheduled by a contractor via Hello! on 6/10/2008 at 1:09:53 PM. Contact: ###-####. met electricians, told that meter area needs labels as well as panels, phase identification required, repair feeder conduit to space, address store front, provide panel schedules, no esc
ELE08-01509 Electrical Rough-In6/10/20086/11/20086/11/2008 9:22:20 AMAPASS
Suits 206 & 214 Store fronts are ready, early is OK. Phone #: ###-#### Internet Inspection Request from: Lloyd Looney store fronts only ok to cover, no esc
ELE08-01535 Electrical Rough-In6/10/20086/11/20086/11/2008 9:19:19 AMAPASS
Store Front Ready for Roughin, early is OK Phone #: ###-#### Internet Inspection Request from: Lloyd Looney ok to cover store front only, no esc
ELE08-01029 Electrical Rough-In6/10/20086/11/20086/11/2008 7:55:10 AMAPASS
danny Phone #: ###-#### walls only anop ok to cover