ELE08-01470
| Final | 6/11/2008 | 6/11/2008 | 6/11/2008 4:02:13 PM | P | PASS |
|
|
the pump house is ready for the final thanks Scott Phone #: ###-#### Internet Inspection Request from: Scott Abbott ok to final, no esc
|
ELE08-01489
| Final | 6/11/2008 | 6/11/2008 | 6/11/2008 3:41:47 PM | P | PASS |
|
|
Randy''s cell ###-#### Phone #: ###-#### Internet Inspection Request from: Randy Fletcher called contractor, ok to final, no esc
|
ESC08-00252
| General Inspection | 6/11/2008 | 6/11/2008 | 6/11/2008 3:11:31 PM | P | PASS |
|
|
looked ok
|
ESC08-00328
| General Inspection | 6/11/2008 | 6/11/2008 | 6/11/2008 3:10:28 PM | P | PASS |
|
|
looked ok
|
ESC08-00436
| General Inspection | 6/11/2008 | 6/11/2008 | 6/11/2008 3:05:17 PM | A | PASS |
|
|
looked ok
|
ESC08-00035
| General Inspection | 6/11/2008 | 6/11/2008 | 6/11/2008 3:03:55 PM | A | PASS |
|
|
looked ok
|
ELE08-01567
| Electrical Rough-In | 6/11/2008 | 6/11/2008 | 6/11/2008 2:28:41 PM | P | PASS |
|
|
pool bonding and light nitches Phone #: ###-#### Internet Inspection Request from: Lynn Cable pool bonding and light niches ok to cover, u/g pool to equipment ok to cover, no power or other u/g seen
|
ESC08-00415
| General Inspection | 6/11/2008 | 6/11/2008 | 6/11/2008 1:54:41 PM | P | DONE |
|
|
call to rp, needs to post yellow esc sign, he did not know that he was rp on this job, but will check it out
|
ELE08-01404
| Final | 6/11/2008 | 6/11/2008 | 6/11/2008 1:47:27 PM | P | PASS |
|
|
rod - pool Phone #: ###-#### called contractor, ok to final, no esc
|
ELE08-01564
| Electrical Rough-In | 6/11/2008 | 6/11/2008 | 6/11/2008 1:16:24 PM | P | PASS |
|
|
call for lock box combo//John ###-#### ric baths only ok, no esc
|
ELE08-01572
| Electrical Rough-In | 6/11/2008 | 6/11/2008 | 6/11/2008 12:44:04 PM | P | PASS |
|
|
Ufer inspection. Phone #: ###-#### Internet Inspection Request from: Kathy Smith concrete encased electrode ok to pour
|
ELE08-00406
| Final | 6/10/2008 | 6/11/2008 | 6/11/2008 10:53:06 AM | A | PASS |
|
|
joe Phone #: ###-#### ok to final, signed occupancy card
|
ELE08-01382
| Final | 6/10/2008 | 6/11/2008 | 6/11/2008 10:21:17 AM | P | PASS |
|
|
bill Phone #: ###-#### p/s o/h rec ok
|
ELE08-00899
| Rough-In Permanent Service | 6/10/2008 | 6/11/2008 | 6/11/2008 9:31:02 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 1:11:43 PM. Contact: ###-####. see conference
|
ELE08-00899
| Conference | 6/11/2008 | 6/11/2008 | 6/11/2008 9:30:19 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 1:11:43 PM. Contact: ###-####. met electricians, told labels, address, panel schedules required before power can be turned on, no esc
|
ELE08-00898
| Rough-In Permanent Service | 6/10/2008 | 6/11/2008 | 6/11/2008 9:27:54 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 1:09:53 PM. Contact: ###-####. see conference
|
ELE08-00898
| Conference | 6/11/2008 | 6/11/2008 | 6/11/2008 9:27:17 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 1:09:53 PM. Contact: ###-####. met electricians, told that meter area needs labels as well as panels, phase identification required, repair feeder conduit to space, address store front, provide panel schedules, no esc
|
ELE08-01509
| Electrical Rough-In | 6/10/2008 | 6/11/2008 | 6/11/2008 9:22:20 AM | A | PASS |
|
|
Suits 206 & 214 Store fronts are ready, early is OK. Phone #: ###-#### Internet Inspection Request from: Lloyd Looney store fronts only ok to cover, no esc
|
ELE08-01535
| Electrical Rough-In | 6/10/2008 | 6/11/2008 | 6/11/2008 9:19:19 AM | A | PASS |
|
|
Store Front Ready for Roughin, early is OK Phone #: ###-#### Internet Inspection Request from: Lloyd Looney ok to cover store front only, no esc
|
ELE08-01029
| Electrical Rough-In | 6/10/2008 | 6/11/2008 | 6/11/2008 7:55:10 AM | A | PASS |
|
|
danny Phone #: ###-#### walls only anop ok to cover
|