PLM09-00784
| Plumbing Rough-in | 6/10/2009 | 6/11/2009 | 6/11/2009 4:43:34 PM | P | PART |
|
|
John ###-#### need test on waste...............water ok.......ds
|
PLM09-00748
| Final | 6/10/2009 | 6/11/2009 | 6/11/2009 4:31:37 PM | A | PASS |
|
|
|
PLM09-00507
| DOC - Permit Finaled | 6/11/2009 | 6/11/2009 | 6/11/2009 2:57:40 PM | P | PASS |
|
|
|
PLM09-00892
| Groundwork | 6/10/2009 | 6/11/2009 | 6/11/2009 2:51:07 PM | P | PASS |
|
|
Gary Phone #: ###-####
|
PLM09-00616
| Final | 6/5/2009 | 6/11/2009 | 6/11/2009 2:02:29 PM | P | PASS |
|
|
CONTACT PERRY WITH KEILTY CONSTRUCTION ###-#### WITH TIME OF THE INPSECTION SO HE CAN MAKE SURE HE IS THERE TO GET YOU IN Phone #: ###-#### Internet Inspection Request from: Chris Field
|
PLM09-00685
| Water and/or Sewer | 6/10/2009 | 6/11/2009 | 6/11/2009 11:42:43 AM | A | PASS |
|
|
Bob Phone #: ###-####
|
PLM09-00887
| Plumbing Rough-in | 6/11/2009 | 6/11/2009 | 6/11/2009 10:54:23 AM | A | PASS |
|
|
Internet Inspection Request from: Erin Whiting
|
PLM09-00885
| Sprinkler (Final) | 6/9/2009 | 6/11/2009 | 6/11/2009 9:51:47 AM | A | PASS |
|
|
mike Phone #: ###-####
|
PLM09-00869
| Water and/or Sewer | 6/10/2009 | 6/11/2009 | 6/11/2009 9:12:21 AM | A | CANC |
|
|
tie in is installed using proper valves and 160 psi up to backflow and backflow has been tested and tagged, everything is double hose clamped ect. Phone #: ###-#### Internet Inspection Request from: Sean McCullough
|
PLM09-00869
| Sprinkler (Final) | 6/11/2009 | 6/11/2009 | 6/11/2009 9:12:09 AM | A | PASS |
|
|
tie in is installed using proper valves and 160 psi up to backflow and backflow has been tested and tagged, everything is double hose clamped ect. Phone #: ###-#### Internet Inspection Request from: Sean McCullough
|
PLM09-00877
| Sprinkler (Final) | 6/10/2009 | 6/11/2009 | 6/11/2009 9:00:41 AM | A | PASS |
|
|
joe
|