BLD09-00649
| BLD-Framing/Rough-in | 6/11/2009 | 6/11/2009 | 6/11/2009 1:31:26 PM | P | PASS |
|
|
rick Phone #: ###-####. All issues resolved. Also received and reviewed Letter from engineer. Will have scanned into permit.
|
ESC08-00914
| General Inspection | 6/11/2009 | 6/11/2009 | 6/11/2009 11:35:51 AM | A | PART |
|
|
Needs to sweep all sediments from hard surfaces and pick up const. debries.
|
BLD08-02252
| BLD-Framing/Rough-in | 6/10/2009 | 6/11/2009 | 6/11/2009 11:30:27 AM | A | PASS |
|
|
ray Phone #: ###-####
|
BLD09-00748
| BLD-Framing/Rough-in | 6/10/2009 | 6/11/2009 | 6/11/2009 10:19:53 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/10/2009 at 11:51:12 AM. Contact: ###-####. Interior framed walls only. No grid. Pending ele. ri.
|
BLD09-00658
| BLD-Conference | 6/10/2009 | 6/11/2009 | 6/11/2009 9:56:20 AM | A | DONE |
|
|
Don Phone #: ###-####. Provide engineering for new floor design and resubmit to plan reveiw for approval.
|