Inspections for the day of: Friday, June 11, 2010.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00371 FIR-Aging Inspection6/11/20106/11/20106/16/2010 1:33:13 PM DONE
Site visit confirmed construction on this project has been suspended.
FIR10-00233 INSP-Final Inspection6/10/20106/11/20106/16/2010 12:51:13 PMPFAIL
One notification appliance failed to operate, noted mag locks at the NE exit door do not release on fire alarm. Duct detectors tested satisfactory.
FIR10-00240 INSP-Final Inspection6/11/20106/11/20106/11/2010 3:44:43 PMPPASS
Scope of work passed functional testing. Permit finaled.
FIR06-00474 DOC - Permit Expired6/11/20106/11/20106/11/2010 3:42:51 PMPPASS
Tenant has relocated, building is vacant. Permit expired- IFC 2006 sec. 105.3.1
FIR03-00297 DOC - Permit Expired6/11/20106/11/20106/11/2010 3:38:13 PMPPASS
Ref IFC 2006 sec. 105.3.1
FIR03-00297 FIR-Aging Inspection6/11/20106/11/20106/11/2010 3:36:58 PM DONE
FIR06-00336 DOC - Permit Finaled6/11/20106/11/20106/11/2010 3:31:43 PMPPASS
Tested in conjunction with FIR06-00527.
FIR06-00336 FIR-Aging Inspection6/11/20106/11/20106/11/2010 3:30:40 PM DONE
BLD10-00257 FIRE-Final Inspection6/11/20106/11/20106/11/2010 3:21:23 PMPPASS
Reinspection passed for noted correction items. Comments # 10 and 11 on the fire code review are not applicable- building is not equipped with a fire alarm system. HVAC units are below min. cfm to require duct detectors.
BLD08-00264 FIRE-Final Inspection6/10/20106/11/20106/11/2010 3:17:51 PMAFAIL
Door hardware at the new F1 area needs to operate "fail safe" in the direction of travel, fire lane marking is not finished, discussed lock at gate, schedule for project completion.
BLD10-00257 FIRE-Final Inspection6/10/20106/11/20106/11/2010 3:12:47 PMAFAIL
Missing building address numbers per review note #2, one exit sign per plan review red-lines needs to be relocated. EM lighting passed.