ESC09-00352
| General Inspection | 6/11/2010 | 6/11/2010 | 6/11/2010 1:24:16 PM | P | DONE |
|
|
Met with Kelly, (Parks), Wetlands LLC, C. Smith. Due to volume of water released from the water holdings up stream water has exceeded the 6500 cfs water mark. Water is running into the park and then discharging of water back into the river is occurring. Discharge of water duing the time of inspection has a high degree of clarity. Informed parties that daily monitioring of site is recommended and think through what types of controls could be implemented to decrease any turbid discharge if during the daily inspection turbid discharge is occurring.
|
ESC09-00198
| Conference | 6/11/2010 | 6/11/2010 | 6/11/2010 10:03:54 AM | A | DONE |
|
|
Talked to the sub-contractor, Cloverdale Nursery. Cloverdale is working the stockpiled soils under the permit holder, (Western Construction). Discussed compliance issues with Jim (Cloverdale), remove old silt fence, post sign, top dress existing construction entrance. Also reviewed process for transfering of ESC permit if Western and Cloverdale makes that decision. Recommended they discuss how to best remain in compliance with Jason at Western.
|