Inspections for the day of: Monday, June 11, 2012.
Number of inspections: 15
Percentage of inspections complete: 73 %
Percentage of inspections not complete: 27 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00530 Site Preparation6/4/20126/4/2012   
ESC11-00785 Aging Inspection6/5/20126/5/2012   
ESC12-00485 General Inspection6/6/20126/6/2012   
ESC11-00408 General Inspection6/8/20126/8/2012   
BLD11-02525 BLD-Foundation6/11/20126/11/20126/11/2012 4:02:14 PMPPASS
Alvaro Phone #: ###-####
GCB12-00057 GCB-Ceiling Grid6/11/20126/11/20126/11/2012 3:24:54 PMPPASS
Chuck @ ###-####
Afternoon inspection for today please.
BLD12-01476 BLD-Footing6/11/20126/11/20126/11/2012 2:51:41 PMPPASS
James Phone #: ###-####
BLD12-01201 BLD-Framing/Rough-in6/11/20126/11/20126/11/2012 1:52:08 PMPPASS
BLD12-01201 BLD-Framing/Rough-in6/8/20126/11/20126/11/2012 1:28:39 PMANR
Phone #: ###-#### >> Inspection requested via web by Brian McCoy
GCB12-00042 GCB-Framing6/8/20126/11/20126/11/2012 10:29:09 AMAFAIL
Kevin @ ###-####. Needs to remove tyvek for shear nailing inspection, mechanical rough in inspection has not been passed. Corrwection notice was posted.
GCB12-00025 GCB-Framing6/8/20126/11/20126/11/2012 9:31:34 AMANR
###-####. Airseal pak not completed. 5/8 typex at soffot ok.
BLD12-00515 BLD-Final6/8/20126/11/20126/11/2012 9:08:56 AMAPASS
BLD12-00515 DOC - Permit Finaled6/11/20126/11/20126/11/2012 9:08:46 AMPPASS
ESC12-00483 Site Preparation6/11/20126/11/20126/11/2012 8:45:27 AMAPART
Needs to post ESC permit sign and concrete washout.
BLD12-01163 BLD-Footing6/11/20126/11/20126/11/2012 8:44:42 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Ben Sears