BLD13-01052
| FIRE-Conference | 6/11/2013 | 6/11/2013 | 6/11/2013 3:35:05 PM | P | DONE |
|
|
Brad and I did a walk through of Phase 2A of the ED Expansion. I deferred him to the fire dept to approve a revised exiting plan if it deviates from the previously approved plan.
|
BLD12-03157
| FIRE-Final Inspection | 6/11/2013 | 6/11/2013 | 6/11/2013 3:22:36 PM | P | PASS |
|
|
life safety passed
|
BLD11-00519
| FIRE-Final Inspection | 6/10/2013 | 6/11/2013 | 6/11/2013 3:20:28 PM | A | FAIL |
|
|
Todays inspection was a cover for the underground supply line. Everything can be covered except for the locations of the thrust blocks which are not complete. Treasure valley fire is supervising the underground installation.
|
FIR13-00168
| INSP-Final Inspection | 6/10/2013 | 6/11/2013 | 6/11/2013 10:16:22 AM | A | PASS |
|
|
Permit finaled
|
FIR13-00184
| INSP-Sprinkler Rough-in | 6/10/2013 | 6/11/2013 | 6/11/2013 12:00:00 AM | A | CANC |
|
|
troy or joe @ ###-#### Phone #: ###-####
|