FIR14-00250
| INSP-Final Inspection | 6/10/2014 | 6/11/2014 | 6/12/2014 2:16:46 PM | A | PASS |
|
|
permit finaled
|
FIR14-00355
| INSP-Final Inspection | 6/11/2014 | 6/11/2014 | 6/12/2014 12:54:37 PM | A | PASS |
|
|
Permit finaled
|
FIR14-00314
| INSP-Sprinkler Rough-in | 6/11/2014 | 6/11/2014 | 6/11/2014 3:02:02 PM | P | PART |
|
|
I performed the rough-in inspection with the as-built plans but will need the stamped city approved prior to an "ok" to cover being given.
|
BLD14-01462
| FIRE-Final Inspection | 6/10/2014 | 6/11/2014 | 6/11/2014 12:05:08 PM | A | PART |
|
|
Temporary for life safety per scope of work.
|
FIR14-00314
| INSP-Sprinkler Rough-in/Hydro | 6/10/2014 | 6/11/2014 | 6/10/2014 2:54:59 PM | A | PASS |
|
|
Oh hydro passed including the remoter FDC
|