Inspections for the day of: Thursday, June 11, 2015.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00225 INSP-Final Inspection6/11/20156/11/20156/11/2015 3:10:40 PMPPASS
permit finaled
FIR15-00169 INSP-Final Inspection6/11/20156/11/20156/11/2015 2:58:18 PMPPASS
Permit finaled
BLD15-01204 FIRE-Final Inspection6/11/20156/11/20156/11/2015 2:37:51 PMPCANC
Cancel per Zack Phone #: ###-####
BLD15-00862 FIRE-Final Inspection6/10/20156/11/20156/11/2015 2:08:45 PMPFAIL
Provide the fire review comments, provide the missing exit signs (test all exit/emergency lights), provide single action hardware on the restroom door, remove the dead bolts from the front and rear doors with panic hardware, provide final inspection for the fire sprinkler permit.
BLD13-03318 FIRE-Conference6/10/20156/11/20156/11/2015 1:38:25 PMPDONE
I met with Scott regarding what is required for the fire final. Items include alarm bell, fire alarm system, address...ect
FIR15-00305 INSP-Sprinkler Rough-in6/11/20156/11/20156/11/2015 12:51:17 PMPPASS
See the city approved plans for hard lid areas where the piping is ok to cover.
FIR15-00236 INSP-Sprinkler Rough-in/Hydro6/11/20156/11/20156/11/2015 12:50:01 PMPPASS
Rough-in and overhead 200lb hydro for the new dock dry pipe system passed
BLD14-00948 FIRE-Final Inspection6/10/20156/11/20156/11/2015 11:01:15 AMAPASS
life safety passed
FIR15-00244 INSP-Sprinkler Rough-in6/11/20156/11/20156/11/2015 10:59:35 AMPPASS
Rough-in passed. Piping can be covered.
BLD13-03592 FIRE-Final Inspection6/10/20156/11/20156/11/2015 10:16:32 AMAPASS
Life safety passed
BLD13-03591 FIRE-Final Inspection6/10/20156/11/20156/11/2015 10:14:03 AMAPASS
Life safety passed
BLD13-03590 FIRE-Final Inspection6/10/20156/11/20156/11/2015 10:12:33 AMAPASS
Life safety passed
BLD15-00788 FIRE-Final Inspection6/10/20156/11/20156/11/2015 9:50:15 AMAPART
Life safety passed in rooms 6, 101 and 102
FIR15-00224 INSP-Final Inspection6/10/20156/11/20156/11/2015 8:49:17 AMAPASS
Permit finaled
FIR15-00276 INSP-Final Inspection6/10/20156/11/20156/11/2015 8:43:59 AMAPASS
Permit finaled
FIR14-00764 INSP-Final Inspection6/10/20156/11/20156/11/2015 8:36:19 AMAPASS
Permit finaled
FIR14-00763 INSP-Final Inspection6/10/20156/11/20156/11/2015 8:35:43 AMAPASS
Permit finaled
FIR15-00275 INSP-Final Inspection6/10/20156/11/20156/11/2015 8:35:14 AMAPASS
Permit finaled
FIR14-00762 INSP-Final Inspection6/10/20156/11/20156/11/2015 8:34:25 AMAPASS
Permit finaled
FIR15-00274 INSP-Final Inspection6/10/20156/11/20156/11/2015 8:33:32 AMAPASS
Permit finaled