BLD13-03389
| FIRE-Final Inspection | 6/11/2015 | 6/11/2015 | 6/11/2015 2:43:26 PM | P | PASS |
|
|
Need to confirm FS UG supply hydrotest and flush has been witnessed by this office prior to finaling grading permit.
|
FIR14-00191
| INSP-Final Inspection | 6/11/2015 | 6/11/2015 | 6/11/2015 2:39:49 PM | P | PEND |
|
|
Inspection request to final FS U/G installation, although the hydrotest and flushing could not be confirmed by reviewing completed inspections recorded in permit activities file. I called Forest to confirm that these inspections were witnessed by him, which is contended by the fire sprinkler contractor. Will advise the contractor and GC accordingly.
|
FIR13-00167
| INSP-Sprinkler Rough-in | 6/11/2015 | 6/11/2015 | 6/11/2015 2:17:26 PM | P | NR |
|
|
Concrete thrust blocks not installed yet - will reschedule inspection, and probably hydrotest for tomorrow.
|
FIR14-00681
| INSP-Final Inspection | 6/10/2015 | 6/11/2015 | 6/11/2015 1:40:20 PM | A | PART |
|
|
Final inspection of Bldg D, includinfg commons area. Need to remove protective cap on A/S in main lobby (2nd floor). Will sign off when this is completed.
|
FIR14-00344
| INSP-Final Inspection | 6/10/2015 | 6/11/2015 | 6/11/2015 1:34:19 PM | A | PART |
|
|
Final inspection of Bldg. D and commons area. Lobby sprinkler at 2nd floor level has protective cap still on. Will need to get a lift to access. Will reschedule final signoff, otherwise rest of system inspected OK
|
FIR14-00362
| INSP-Final Inspection | 6/10/2015 | 6/11/2015 | 6/11/2015 1:29:21 PM | A | PART |
|
|
Final inspection of U/G parking garage wet system. NOTE: Fire caulking needed at stair # 3 pipe penetration. Also need to inspect fire pump room, as this room is under this permit.
|
FIR14-00815
| INSP-Sprinkler Rough-in | 6/10/2015 | 6/11/2015 | 6/11/2015 9:45:51 AM | A | PART |
|
|
Rough to cover inspection for 2nd floor corridor for section 1 - OK to Cover. Also coverage for rotunda and skylight in clubhouse. NOTE: Need HT head for top of skylight.
|
FIR13-00725
| INSP-Sprinkler Rough-in/Hydro | 6/11/2015 | 6/11/2015 | 6/11/2015 8:52:06 AM | P | PASS |
|
|
Hydrotest of wet pipe system protecting Makers Room at the top level of the parking garage - 200 psi @ 2 hours - PASSED
|