Inspections for the day of: Thursday, June 11, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00322 INSP-Supply line flush6/10/20156/11/20156/11/2015 3:02:17 PMPFAIL
Service not turned on to the building
FIR15-00360 INSP-Supply line flush6/10/20156/11/20156/11/2015 3:01:38 PMPFAIL
Service not turned on to the building
FIR15-00320 INSP-Sprinkler Rough-in6/10/20156/11/20156/11/2015 3:00:42 PMPPASS
Overhead sprinkler piping/tenting approved for cover
FIR15-00359 INSP-Sprinkler Rough-in/Hydro6/10/20156/11/20156/11/2015 2:58:08 PMPFAIL
Service not turned on to the building
FIR14-00801 INSP-Final Inspection6/11/20156/11/20156/11/2015 2:10:39 PMPFAIL
This is not a final inspection, this was an underground cover inspection (Pot Marked Inspection for proper cover depth) and an underground flush. Pipe is at an approved depth and supply line is flushed/complete
BLD15-01764 FIRE-Final Inspection6/11/20156/11/20156/11/2015 1:18:25 PMPFAIL
Need to have fire extinguisher mounted in common area of travel, dead bolt on rear door needs to be removed and single action lockable hardware installed.
FIR15-00112 INSP-Sprinkler Rough-in6/11/20156/11/20156/11/2015 11:01:59 AMPPASS
Noted areas approved (Basement Level) for cover in red on the onsite city approved drawings.
FIR14-00801 INSP-Conference6/10/20156/11/20156/11/2015 10:05:57 AMADONE
Verfied with on site contact, "pot marks" are being provided to verify underground piping cover.
FIR15-00003 INSP-Final Inspection6/11/20156/11/20156/11/2015 12:00:00 AMPDONE
as per Jim Page ok to final