ELE18-01998
| Electrical Rough-In | 6/11/2018 | 6/11/2018 | 6/11/2018 2:48:01 PM | P | PASS |
|
|
Please call Tyler Reed (###-####) for specifics. Phone #: ###-#### Inspection requested via web by Scott Campbell Concrete encased up to bond steel beam and into 3 gang mason box to tie in rough in ok cover
|
ELE17-01337
| Electrical Rough-In | 6/8/2018 | 6/11/2018 | 6/11/2018 2:46:24 PM | A | PART |
|
|
All drop ceilings 1st floor except kitchen - rough Roof - final 2nd Floor - Partial final Phone #: ###-#### Inspection requested via web by Clint Tate Guest laundry flexible cords above grid. Work areas 2 rms, laundry areas, meeting rm, managers offices, fitness rm, ice rm grid rough in ok cover Roof- M-3 35, 37 25 amp max, 34, 36 55 amp max, 38, 40 25 amp max M-1 20, 22, 24 50 amp max. Level 2- 212, 214, 218, 222, 224, 228 NR, 217 switched power
|
ELE18-01573
| Electrical Rough-In | 6/11/2018 | 6/11/2018 | 6/11/2018 9:12:56 AM | A | FAIL |
|
|
Ceiling cover. Von is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen 300.15- MC cable shall terminate in a box. 1 area behind reception 1 in office out of wall. 300.11- MC and other cable shall be supported insependant of grid. Fixture whip and low volt.
|