ELE20-01833
| Electrical Rough-In | 6/11/2020 | 6/11/2020 | 6/11/2020 2:10:37 PM | P | PASS |
|
|
call for access // Luke Phone #: ###-####... rough in ok to cover...will require 2nd rough-in inspection to verify makeup and lighting at each egress door...allowing cover to proceed with job
|
ELE20-01976
| Permanent Service | 6/11/2020 | 6/11/2020 | 6/11/2020 1:30:25 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve cooper.. p/s u/g reconnect ok...new panel only bussing burned
|
ELE20-01025
| Final | 6/11/2020 | 6/11/2020 | 6/11/2020 1:05:39 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Stacie Tasker...corrections made...ok to final...card signed
|
ELE19-03867
| Final | 6/11/2020 | 6/11/2020 | 6/11/2020 12:33:04 PM | P | FAIL |
|
|
Call Jay Bedsole for access ###-#### Phone #: ###-#### Inspection requested via web by jamie berg... 1) incandescent and LED light fixtures shall be a minimum of 12 inches off shelf in closets..dwn stairs 2) outlet boxes shall be flush with mounting surface or sit no more than 1/4 inch back...kitchen counter outlets 3) receptacles shall be firmly attached to outlet box...kitchen counter recps 4) hardwired appliances shall have disconnects within sight or lockouts on OCPD..D/W and WH 5) knock out in panel needs addressed...breaker installed or blank installed 6) garage receps shall have GFCI protection..back wall of garage
|
ELE19-04099
| Rough-In Permanent Service | 6/10/2020 | 6/11/2020 | 6/11/2020 11:39:08 AM | A | PASS |
|
|
rough in complete: Units, Shaft liners, Breezeways, Heat cable circuits Phone #: ###-#### Inspection requested via web by Todd Hall... rough ok to cover check heat tape junction box access at final p/s u/g new ok...17 meters needed
|
ELE20-01622
| Electrical Rough-In | 6/10/2020 | 6/11/2020 | 6/11/2020 10:27:09 AM | A | PASS |
|
|
Uffer inspection for service on south end of building Phone #: ###-#### Inspection requested via web by Lynn Cable..ok to cover
|
ELE20-01834
| Electrical Rough-In | 6/10/2020 | 6/11/2020 | 6/11/2020 9:50:31 AM | A | PASS |
|
|
Jay Walters is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listings verified...check panel listing on plans at final 320s not 315s
|
ELE20-01008
| Final | 6/10/2020 | 6/11/2020 | 6/11/2020 9:38:21 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Richard Gratiot..ok to final
|
ELE20-01025
| Final | 6/10/2020 | 6/11/2020 | 6/11/2020 9:22:42 AM | A | FAIL |
|
|
Tobias is the site contact, Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker... 1) electrical service shall be properly marked...disconnects, panels and meters 2) all junction or pull boxes shall have proper blanks installed 3) all work shall be finished...open boxes, missing covers 4) panels shall be completely labelled...verify circuits...miss labelled 5) panel needs latch for cover
|
ELE20-00725
| Electrical Rough-In | 6/10/2020 | 6/11/2020 | 6/11/2020 8:16:49 AM | A | PASS |
|
|
Contact: Jeremy Thornock, ufer ; underground inspections please Phone #: ###-#### Inspection requested via web by Deb Gooden... ok to cover
|