Inspections for the day of: Monday, June 12, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR00-00078 INSP-Sprinkler Rough-in6/12/20006/12/20006/12/2000 12:00:00 AMAPASS
update of records - tenting problems were corrected and approved for cover
FIR00-00078 INSP-Final Inspection6/12/20006/12/20006/12/2000 12:00:00 AMAPASS
flow switch tested for alarm notification, has inside bell. passed on 6/9/00
BLD99-03303 FIRE-Final Inspection6/12/20006/12/20006/12/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 06/12/2000 at 10:00:48. Contact: ###-####. Repair exit signs 6/13/00 2:38:05 PM
BLD99-02727 FIRE-Conference6/12/20006/12/20006/12/2000 12:00:00 AMPNH
###-#### WILL COORDINATE WITH JIM STORY Contractor not there 6/13/00 2:38:38 PM
FIR00-00115 INSP-Supply line flush6/12/20006/12/20006/12/2000 12:00:00 AMPPASS
flush okay
FIR00-00365 INSP-Supply line flush6/12/20006/12/20006/12/2000 12:00:00 AMPPASS
flush okay
BLD00-01153 FIRE-Final Inspection6/9/20006/12/20006/12/2000 12:00:00 AMPNR
###-#### Contractor called on Friday- won't be ready on 6/12/00 6/13/00 2:38:26 PM
BLD99-02669 FIRE-Supply Line Flush6/12/20006/12/20006/12/2000 12:00:00 AMPPASS
dave--###-#### fire--bld #1 Flush ok 6/13/00 2:37:52 PM
BLD99-02693 FIRE-Supply Line Flush6/12/20006/12/20006/12/2000 12:00:00 AMPPASS
bld #2 ###-#### fire Flush ok 6/13/00 2:37:56 PM
BLD99-02702 FIRE-Supply Line Flush6/12/20006/12/20006/12/2000 12:00:00 AMPPASS
fire--dave 989- 1180===bld #3 Flush ok 6/13/00 2:37:45 PM
BLD99-02704 FIRE-Supply Line Flush6/12/20006/12/20006/12/2000 12:00:00 AMPFAIL
dave ###-####--bld #4 Wrong permit number entered 6/13/00 2:38:48 PM