PLM01-00280
| PLM-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | | PASS |
|
|
|
PLM01-00673
| PLM-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | | PASS |
|
|
|
PLM01-01917
| Plumbing Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 11:24:14. Contact: ###-####. partial ri ok, waste and vent not tied into system, 1 1/2" is the waste. 6/12/2001 9:05:12 AM
|
PLM01-01920
| Sprinkler (Final) | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-01847
| Plumbing Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PART |
|
|
Eddy ###-#### temp occ ok, need to verify ccp and pipe equipment drains 6/12/2001 8:47:33 AM
|
PLM01-01681
| Final | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
Eddy ###-#### interceptor sewer test and final ok 6/12/2001 9:15:54 AM
|
PLM01-01353
| Final | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | FAIL |
|
|
###-#### no corrections made 6/12/2001 8:24:00 AM
|
PLM01-01898
| Groundwork | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 08:13:53. Contact: ###-####.
|
PLM01-00538
| Roof Drains | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 08:33:54. Contact: ###-####. 2 east end sets ok , 2nd from s.w. corner ok, need nw corner r.d., 2nd from n.w. corner r.d. and 2nd from s.e.corner r.d. 6/12/2001 3:15:51 PM
|
PLM01-01930
| Final | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | NR |
|
|
###-#### this is a ri 6/12/2001 2:03:58 PM
|
PLM01-01930
| Plumbing Rough-in | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 6/12/2001 2:04:11 PM ri ok
|