FIR01-00309
| INSP-Final Inspection | 6/8/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PART |
|
|
OK on alarm system, 3 spklr heads too close to supply registers 6/12/2001 8:59:08 AM
|
FIR01-00281
| INSP-Final Inspection | 6/8/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PART |
|
|
###-#### delila Completed rough in and verified components. To be tested later 6/12/2001 6:18:45 PM
|
BLD01-00710
| FIRE-Conference | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
Conf with Jeff on fire life/safety issues 6/12/2001 1:39:13 PM
|
BLD01-00369
| FIRE-Final Inspection | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | FAIL |
|
|
###-#### Exit and emerg lights OK All other to be done later 6/12/2001 6:17:09 PM
|
BLD01-00668
| FIRE-Final Inspection | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | FAIL |
|
|
###-#### Exit and emerg lights Ok All other to be done later 6/12/2001 6:16:23 PM
|
FIR01-00166
| INSP-Final Inspection | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PART |
|
|
Ok on hydro test and rough in of preaction system and rough in of rework on wet system 6/12/2001 6:20:23 PM
|
BLD00-03316
| FIRE-Final Inspection | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | NR |
|
|
Not ready for final doors and door hdwre 6/12/2001 8:59:49 AM
|
FIR01-00175
| INSP-Sprinkler Rough-in/Hydro | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 10:54:49. Contact: ###-####.--cancel per terry
|
FIR01-00175
| INSP-Sprinkler Rough-in/Hydro | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | CANC |
|
|
Cancel wrong job 6/12/2001 2:42:13 PM
|
FIR01-00173
| INSP-Final Inspection | 6/4/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PASS |
|
|
Final OK on alarm test 6/12/2001 6:15:23 PM
|