MEC01-01064
| Final | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 11:35:03. Contact: ###-####.
|
BLD01-00268
| BLD-Final | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
###-#### C. of C. #21433 issued. 6/12/2001 9:44:43 AM
|
BLD01-00815
| BLD-Energy code compliance | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
reinspection Nick ###-####
|
BLD01-00992
| BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 15:45:55. Contact: ###-####. ok to insulate 6/12/2001 9:31:41 AM
|
BLD01-00560
| BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | CANC |
|
|
Jan ###-#### Cancelled by contractor 6/12/2001 8:38:16 AM
|
BLD01-01060
| BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | NR |
|
|
shear wall ###-#### No approved plans or address on building. 6/12/2001 9:14:20 AM
|
BLD00-03004
| BLD-Final | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 07:22:26. Contact: ###-####. Cancelled by contractor 6/12/2001 8:32:24 AM
|
BLD01-01359
| BLD-Foundation | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PART |
|
|
Dane ###-#### wip 6/12/2001 2:02:26 PM
|
BLD01-01133
| BLD-Foundation | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PART |
|
|
###-#### wip 6/12/2001 2:18:48 PM
|
BLD01-01133
| BLD-Footing | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PART |
|
|
###-#### Already poured-appears ok 6/12/2001 2:18:34 PM
|
BLD00-03004
| BLD-Final | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 08:35:35. Contact: . C/N issued-tempered glass at window next to kitchen door, fire caulk penetrations in garage. Note:-Provided energy report--ok. 6/12/2001 1:56:29 PM
|
BLD00-03409
| BLD-Framing/Rough-in | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PASS |
|
|
Phil ###-#### INTERIOR SHEAR--OK 6/12/2001 12:39:35 PM
|
BLD01-01400
| BLD-Footing | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 09:29:41. Contact: ###-####. wip 6/12/2001 3:05:59 PM
|
BLD00-03319
| BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 17:16:33. Contact: ###-####. c/n issued--ok to insulate-need engineering on cantilevered deck-behind fireplace. 6/12/2001 1:07:22 PM
|
BLD00-03607
| BLD-Final | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 07:07:52. Contact: ###-####. C/N issued-tempered glass next to patio door and provide energy report--was not provide on 4-4-01 at energy inspection. 6/12/2001 1:34:48 PM
|
BLD01-01340
| BLD-Footing | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PART |
|
|
around 1:30 if possible kieth ###-#### wip 6/12/2001 3:14:45 PM
|