BLD01-00878
| BLD-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | | PART |
|
|
work in progress 6/12/2001 3:44:12 PM
|
BLD01-00778
| BLD-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | | PART |
|
|
exp 9/24 6/12/2001 3:43:02 PM
|
BLD01-00635
| BLD-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | | PART |
|
|
exp 9/9 6/12/2001 3:41:48 PM
|
BLD01-00611
| BLD-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | | PART |
|
|
exp 9/9 6/12/2001 3:40:48 PM
|
BLD01-01267
| BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 11:50:47. Contact: . framing and insulation ok to cover 6/12/2001 10:34:47 AM
|
BLD01-01436
| BLD-Other | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 12:21:59. Contact: ###-####.
|
BLD01-00734
| BLD-Final | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-01531
| BLD-Footing | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
Rob Stout ###-####
|
BLD01-00256
| BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PART |
|
|
ceiling grid tim ###-#### need to ad seismic pods the rest is ok 6/12/2001 11:58:17 AM
|
BLD01-01459
| BLD-Footing | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 15:18:48. Contact: ###-####. needs to get p&z aproval for pop out window in back 6/12/2001 10:10:09 AM
|
BLD01-00449
| BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | A | PART |
|
|
Jim Lough, ###-#### c/c on site ok to insulate 6/12/2001 9:39:24 AM
|
BLD00-03712
| BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 17:19:43. Contact: ###-####. 6/12/2001 10:09:20 AM framing and insulation ok to cover 6/12/2001 2:15:40 PM
|
BLD01-00144
| BLD-Conference | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 08:29:55. Contact: ###-####. 6/12/2001 1:51:50 PM
|
BLD01-01231
| BLD-Framing/Rough-in | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PART |
|
|
jess ###-#### 6/12/2001 1:30:08 PM checked beam to header connection plans called for a h3 crew used 10 inch lag bolt all other connection per plans ok to roof 6/12/2001 2:59:05 PM
|
BLD01-01242
| BLD-Final | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PASS |
|
|
MGM ###-####
|
BLD01-01465
| BLD-Conference | 6/12/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PASS |
|
|
for conf-- bill-- ###-#### 1 hr fire construction 6/13/2001 12:13:16 PM
|
BLD00-03238
| BLD-Final | 6/11/2001 | 6/12/2001 | 6/12/2001 12:00:00 AM | P | PASS |
|
|
Julia ###-####
|