ELE02-01752
| Temporary Service | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PASS |
|
|
emmett ###-####
t/s u/g new ok 6/12/2002 1:59:33 PM
|
ELE02-01695
| Electrical Rough-In | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/11/2002 at 13:52:18. Contact: ###-####. u/g for pole lights 6/12/2002 11:48:18 AM
|
ELE99-01077
| Final | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PASS |
|
|
ROSHELL ###-#### survey posted called 314.20 needs box extension outlet peninsular counter 6/12/2002 11:49:47 AM
|
ELE02-01284
| Final | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PASS |
|
|
###-#### looked at work Allstate did only ok 6/12/2002 1:36:48 PM
|
ELE02-01727
| Final | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PASS |
|
|
###-#### richard ok 6/12/2002 12:27:52 PM
|
ELE02-01757
| Rough-In Permanent Service | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | NR |
|
|
###-#### zane boxes not flush with finish material and 250.24 shall terminate GEC to the gruonded,neutral bus not equip grding bus met with contractor at job site 6/12/2002 3:03:01 PM
|
ELE01-02171
| Final | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | PART |
|
|
DAN ###-#### temp ok 6/12/2002 5:22:01 PM
|
ELE01-02173
| Final | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | PART |
|
|
DAN ###-#### temp ok
6/12/2002 5:21:32 PM
|
ELE01-02174
| Final | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | PART |
|
|
DAN ###-#### temp ok 6/12/2002 5:21:47 PM
|