ELE01-02345
| Final | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | NR |
|
|
###-#### call first to meet there
had conf will be taken over by a contractor 6/12/2002 1:22:59 PM
|
ELE02-01708
| Final | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | CANC |
|
|
###-#### dana no work done at this address 6/12/2002 9:59:17 AM
|
ELE01-03983
| Final | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PASS |
|
|
###-#### mark
|
ELE02-01501
| Electrical Rough-In | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PART |
|
|
walls ok 6/12/2002 11:51:29 AM
|
ELE02-01666
| Permanent Service | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 08:20:08. Contact: ###-####.
requires 3 ft clearance above the roof 6/12/2002 5:07:13 PMcallce contractor got mach. 6/12/2002 5:07:47 PM
|
ELE02-01741
| Electrical Rough-In | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | NR |
|
|
CONFERENCE ONLY ###-#### HEATHER PLEASE CALL 1ST
Had conf about conductors required to be outside the building. 6/12/2002 4:40:56 PM
|
ELE02-01759
| Rough-In Permanent Service | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | NR |
|
|
FRANK ###-####
had conf 6/12/2002 3:23:39 PM
|
ELE01-02180
| Electrical Rough-In | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | PASS |
|
|
###-#### MARK
Narthex and reception 101 ceiling ok 6/12/2002 6:11:06 PM
|
ELE02-01457
| Final | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 11:01:19. Contact: ###-####.
cannot tell where countertops are in kitchen, and range recep must be 4 wire type and cover box 6/12/2002 2:35:32 PM
|