PLM02-01714
| Plumbing Rough-in | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-01715
| Sprinkler (Final) | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | FAIL |
|
|
###-#### upc 103.5.1.4 uncover sprinkler tie -in for inspection left message with contractor and left correction notice on job site. 6/12/2002 11:20:50 AM
|
PLM02-01707
| Groundwork | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/11/2002 at 19:35:08. Contact: ###-####.
|
PLM02-01706
| Groundwork | 6/11/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/11/2002 at 19:36:12. Contact: ###-####.
|
PLM02-01717
| Water and/or Sewer | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | PART |
|
|
OFFICE ###-#### installed lower section of manhole and is pouring bottom base 6/12/2002 2:49:31 PM
|
PLM02-00920
| Plumbing Rough-in | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 10:59:42. Contact: ###-####.
|
PLM02-00896
| Final | 6/12/2002 | 6/12/2002 | 6/12/2002 12:00:00 AM | P | PASS |
|
|
|