Inspections for the day of: Wednesday, June 12, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02071 BLD-Final6/11/20026/12/20026/12/2002 12:00:00 AMAPASS
###-#### rod ele,plm & mec should be finaled 6/11 pm
BLD01-02783 BLD-Final6/11/20026/12/20026/12/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/11/2002 at 12:14:30. Contact: ###-####.
BLD02-00699 BLD-Footing6/11/20026/12/20026/12/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/11/2002 at 12:32:33. Contact: ###-####. pending spec insp 6/12/2002 9:30:48 AM
BLD99-00884 BLD-Conference6/11/20026/12/20026/12/2002 12:00:00 AMACANC
rocheal ###-####
BLD02-01010 BLD-Footing6/11/20026/12/20026/12/2002 12:00:00 AMAPASS
###-#### chuck
MEC02-01571 Rough-in6/11/20026/12/20026/12/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 06/11/2002 at 17:05:43. Contact: ###-####.
MEC02-01571 Pressure Test6/11/20026/12/20026/12/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 06/11/2002 at 17:06:20. Contact: ###-####.
BLD02-00783 BLD-Framing/Rough-in6/11/20026/12/20026/12/2002 12:00:00 AMAFAIL
fr insp- jack ###-#### cn posted 6/12/2002 11:10:23 AM
BLD02-01181 BLD-Foundation6/11/20026/12/20026/12/2002 12:00:00 AMAPASS
CAL ###-####
BLD02-00311 BLD-Footing6/11/20026/12/20026/12/2002 12:00:00 AMAPART
JIM ###-#### 6/12/2002 11:34:08 AM ft north south and int fts 6/12/2002 11:35:05 AM
BLD02-00311 BLD-Footing6/11/20026/12/20026/12/2002 12:00:00 AMPCANC
JIM ###-####
BLD02-00067 BLD-Final6/12/20026/12/20026/12/2002 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 06/12/2002 at 09:02:51. Contact: ###-####. no ans on phone left message to rescedule 6/12/2002 4:21:23 PM
BLD01-02761 BLD-Final6/12/20026/12/20026/12/2002 12:00:00 AMPPASS
###-#### RANDY