BLD03-00920
| BLD-Final | 6/11/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 10:08:16 AM. Contact: ###-####.Ok temp needs smoke seal at the door and needs to shut. 6/12/2003 4:17:19 PM
|
BLD03-01200
| BLD-Footing | 6/11/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | A | PART |
|
|
###-####. needs to put in rebar as shown on writing over hold down schedual. 6/12/2003 1:03:33 PM
|
BLD02-02994
| BLD-Final | 6/11/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | A | FAIL |
|
|
left over from yesterday. see notes from then.6/11/2003 5:52:12 PM 6/11/2003 5:52:28 PM Still needs fire life safety and prior c/n break room counter plugs need to move out for 24 in reach range. and need let another c/n.6/12/2003 10:40:44 AM 6/12/2003 10:53:52 AM
|
BLD03-00556
| BLD-Final | 6/11/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | A | NR |
|
|
left over ftrom yesterday see notes from then. 6/11/2003 5:54:57 PM Posted a c/n to final plm03-01216 sprinkler before caling for a final. also no access. 6/12/2003 9:54:45 AM
|
BLD03-00671
| BLD-Framing/Rough-in | 6/11/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | A | FAIL |
|
|
left over from yesterday see notes from then. 6/11/2003 5:56:25 PM. rear wall and left wall changed, need revised floor and res check, unable to complete a shear inspection did go over general requirements with builder for shear.needs more staples. 6/12/2003 11:57:47 AM 6/12/2003 11:58:05 AM
|
BLD02-01804
| BLD-Final | 6/11/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | A | FAIL |
|
|
left over from yesterday see notes from then. 6/11/2003 6:00:30 PMposted a c/n. 6/12/2003 9:44:13 AM
|
BLD02-02473
| BLD-Framing/Rough-in | 6/11/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | A | PART |
|
|
left over from yesterday see notes from then. 6/11/2003 6:01:00 PM. kitchen not ready , fire caulk wires through pipe. brace 2 trusses and need letter for wall to at 6/12/2003 1:06:15 PM attic space not shown on plan. 6/12/2003 1:06:32 PM 6/12/2003 1:06:44 PM
|
BLD02-01148
| BLD-Conference | 6/12/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | A | DONE |
|
|
person named craig called me ,about the correction i left for the new rear door, appearantly he talked with architect and the architect told him how he wanted landing constructed I guess he did not like what arcitect told him , wanted to run something by me I replied do as your architect requested it is his project, I do not desing ramps only check to see that max slope would be 1/4 to foot as written. 6/12/2003 10:13:55 AM
|
BLD02-01804
| BLD-Final | 6/12/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | P | PASS |
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD03-00612
| BLD-Final | 6/12/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | P | NR |
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore This permit includes the garage which has a separat permit for electrical and is not yet finaled, I just passed shear on the garage yester day.I called justin about this. 6/12/2003 2:07:01 PM
|
BLD03-00612
| BLD-Final | 6/12/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | P | PASS |
|
|
|
BLD03-00920
| BLD-Final | 6/12/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | P | PASS |
|
|
ok for perm oc. 6/12/2003 4:15:38 PM
|
BLD03-01261
| BLD-Framing/Rough-in | 6/12/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/12/2003 at 8:04:04 AM. Contact: ###-####. framing ok but,This need electrical approved and insulation in south wall insulated, contractor on site will recall. 6/12/2003 3:08:11 PM 6/12/2003 3:12:49 PM
|
BLD03-01274
| BLD-Footing | 6/12/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | P | PART |
|
|
###-#### fredhouseonly 6/12/2003 2:55:44 PM
|
BLD03-00996
| BLD-Footing | 6/12/2003 | 6/12/2003 | 6/12/2003 12:00:00 AM | P | NR |
|
|
kathryn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|