Inspections for the day of: Thursday, June 12, 2008.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00331 INSP-Sprinkler Rough-in6/11/20086/12/20086/13/2008 9:02:24 AMAPART
The stub out from the building to 10' out is ok to cover. Piping as installed is 6" and matches what is shown on the plans.
FIR08-00351 INSP-Sprinkler Rough-in/Hydro6/12/20086/12/20086/12/2008 3:18:28 PMPPASS
The deficiencies have been corrected and the sprinkler piping can be covered.
BLD08-01249 FIRE-Final Inspection6/10/20086/12/20086/12/2008 3:17:42 PMAPART
A temporary occupancy was given until the fire extinguishers have been provided as discussed.
BLD08-00859 FIRE-Final Inspection6/11/20086/12/20086/12/2008 3:16:31 PMACANC
Wrong inspection called in.
BLD07-01845 FIRE-Conference6/10/20086/12/20086/12/2008 11:43:47 AMADONE
I met the other inspectors and the general contractor and discussed project phasing.
BLD06-00014 FIRE-Final Inspection6/11/20086/12/20086/12/2008 10:55:12 AMAPASS
life safety passed