FIR08-00504
| INSP-Final Inspection | 6/12/2009 | 6/12/2009 | 6/12/2009 4:38:18 PM | P | PASS |
|
|
permit finaled
|
FIR09-00325
| INSP-Final Inspection | 6/10/2009 | 6/12/2009 | 6/12/2009 4:38:00 PM | P | PASS |
|
|
permit finaled
|
BLD08-02550
| FIRE-Final Inspection | 6/12/2009 | 6/12/2009 | 6/12/2009 2:32:13 PM | P | PASS |
|
|
Life Safety Passed
|
BLD09-00233
| FIRE-Final Inspection | 6/11/2009 | 6/12/2009 | 6/12/2009 2:31:01 PM | P | PASS |
|
|
Life safety passed
|
FIR08-00830
| INSP-Sprinkler Rough-in/Hydro | 6/11/2009 | 6/12/2009 | 6/12/2009 2:29:06 PM | A | PART |
|
|
3rd floor piping okay to cover except for 1" vertical risers in exterior walls. Insulation needs to be verified prior to covering. One sidewall head was overspaced. Proper spacing will be verified at final.
|
BLD09-00703
| FIRE-Final Inspection | 6/12/2009 | 6/12/2009 | 6/12/2009 2:03:05 PM | P | FAIL |
|
|
Mount fire extinguisher at new kitchen with current inspection tag. Repair exit sign at east front door. Provide emergency lighting on pottery side of tenant. Remove curtain so that second exit can be seen. Provide exit sign to the rear exit as shown on the approved plans. Remove key lock from the kitchen side exit door. Repair emergency light on kitchen side of tenant.
|
FIR09-00256
| INSP-Sprinkler Rough-in/Hydro | 6/11/2009 | 6/12/2009 | 6/12/2009 12:09:46 PM | A | PART |
|
|
Rough-to-cover inspection for building 504 is passed. A hanger was installed as I waited and metal flashing was cut away from the vertical riser as well.
|
BLD08-01071
| FIRE-Final Inspection | 6/11/2009 | 6/12/2009 | 6/12/2009 12:08:34 PM | A | PART |
|
|
Life safety passed for unit 533 Ph
|
FIR09-00150
| FIR-Aging Inspection | 6/12/2009 | 6/12/2009 | 6/12/2009 11:26:42 AM | | NR |
|
|
Work in progress
|
BLD08-00475
| FIRE-Final Inspection | 6/11/2009 | 6/12/2009 | 6/12/2009 11:24:47 AM | A | PASS |
|
|
Life safety passed
|
BLD09-00238
| FIRE-Final Inspection | 6/11/2009 | 6/12/2009 | 6/12/2009 11:23:42 AM | A | PASS |
|
|
Life safety passed
|
BLD09-00893
| FIRE-Final Inspection | 6/11/2009 | 6/12/2009 | 6/12/2009 11:20:28 AM | A | PART |
|
|
Temporary occupancy given until the deficiencies noted on the city approved plans have been corrected.
|
FIR07-00971
| INSP-Final Inspection | 6/11/2009 | 6/12/2009 | 6/12/2009 8:51:58 AM | P | CANC |
|
|
Cancelled per Forrest. To be rescheduled for next week.
|
FIR09-00120
| INSP-Final Inspection | 6/10/2009 | 6/12/2009 | 6/12/2009 8:51:15 AM | A | CANC |
|
|
Cancelled per Robert due to needing to charge batteries for the FACP. To be rescheduled for Monday
|
FIR09-00325
| INSP-Sprinkler Rough-in/Hydro | 6/10/2009 | 6/12/2009 | 6/10/2009 4:11:50 PM | P | CANC |
|
|
Mike B is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|