Inspections for the day of: Tuesday, June 12, 2012.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00790 Aging Inspection6/12/20126/12/20126/19/2012 8:03:27 AM PASS
ESC12-00153 General Inspection6/12/20126/12/20126/18/2012 7:26:00 AM PASS
ESC12-00147 General Inspection6/12/20126/12/20126/14/2012 12:36:35 PM PASS
ESC11-00560 DOC - Permit Finaled6/12/20126/12/20126/12/2012 1:54:33 PMPPASS
ESC11-00504 Aging Inspection6/12/20126/12/20126/12/2012 1:52:33 PM DONE
Permit finaled.
ESC11-00504 DOC - Permit Finaled6/12/20126/12/20126/12/2012 1:50:36 PMPPASS
ESC11-00476 Aging Inspection6/12/20126/12/20126/12/2012 1:50:18 PM PASS
ESC11-00184 General Inspection6/12/20126/12/20126/12/2012 9:02:11 AM PASS
ESC11-00223 General Inspection6/12/20126/12/20126/12/2012 8:54:05 AM PASS
ESC12-00540 Tracking Control6/12/20126/12/20126/12/2012 8:51:24 AMAFAIL
Correction Notice:
(RP Adam Lyman)

1. Clean up all sediment and debris tracked out of the disturbed soil.
2. Maintain construction exit to prevent soil tracking. EX: extend the exit.
3.Provide a dust control method to keep soil particals from becoming airborne.
Failure to comly with the notice will result in a stop work order. Will re-inspect on 6/13/2012 AM.
ESC11-00690 General Inspection6/12/20126/12/20126/12/2012 8:13:02 AM DONE
Permit finaled.
ESC11-00690 DOC - Permit Finaled6/12/20126/12/20126/12/2012 8:12:50 AMPPASS
ESC12-00194 Site Preparation6/8/20126/12/20126/12/2012 8:11:29 AMAPART
Need to clean up all sediment and debris off of the hard surfaces on a daily basis. Protect the storm drain in the parking lot next to the project to the north east.