Inspections for the day of: Monday, June 12, 2017.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrian Scoles
TitleMEC INSPECTOR
Phone #914-4915
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC17-02267 Rough-in6/12/20176/12/20176/12/2017 4:12:36 PMPPASS
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- equipment not set- check at final
MEC17-02267 Pressure Test6/12/20176/12/20176/12/2017 4:08:14 PMPPASS
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN-20lb gas pass- 5lb flue x 2 pass
MEC17-02084 Rough-in6/9/20176/12/20176/12/2017 3:29:30 PMPFAIL
Mark: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello- need approved manual J onsite for inspection
MEC17-02084 Pressure Test6/9/20176/12/20176/12/2017 3:28:56 PMPPART
Mark: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello- 2olb gas pass- need to test flue
MEC17-02190 Final6/7/20176/12/20176/12/2017 3:25:34 PMPNH
Please call Jake Lake at ###-#### about 30 - 60 minutes prior to inspection so he can get home. Phone #: ###-#### Inspection requested via web by Mary LaFayette- called Jake no answer- stopped by house no one home
MEC17-02299 Final6/12/20176/12/20176/12/2017 3:12:07 PMPPASS
Would like later PM and call when on way. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria
MEC17-02299 Pressure Test6/12/20176/12/20176/12/2017 3:11:53 PMPPASS
Would like later PM and call when on way. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria- 5 lb flue pass
MEC17-02311 Final6/12/20176/12/20176/12/2017 2:55:38 PMPPASS
MEC17-02311 Pressure Test6/12/20176/12/20176/12/2017 2:54:42 PMPPASS
Please call the homeowner for access at ###-#### and Marty at ###-#### if you have any questions Phone #: ###-#### Inspection requested via web by Lea Briggs- 20lb gas pass
MEC17-02247 Rough-in6/12/20176/12/20176/12/2017 2:30:44 PMPPASS
Inspection requested via web by Jason Robinson
MEC17-02319 Final6/12/20176/12/20176/12/2017 2:24:44 PMPPASS
Would like late pm and call when on way. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria
MEC17-02306 Final6/12/20176/12/20176/12/2017 2:06:29 PMPPEND
pressure test and final gas line Phone #: ###-#### Inspection requested via web by Nick Drake- 60lb gas pass on existing system- can not tag meter until licensed contractor assumes the gas piping for new 2" pipe from meter to new boiler- talked with Jordan about this
MEC17-02245 Rough-in6/9/20176/12/20176/12/2017 1:10:00 PMPPASS
request for R/I inspection. Please contact job lead Derek ###-#### or John Shartzer ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery- seal ok on duct- ok for ceiling grid install
MEC16-03605 Mec-Aging Inspection6/12/20176/12/20176/12/2017 11:11:31 AM PEND
no final called in
MEC17-02316 Final6/9/20176/12/20176/12/2017 10:59:32 AMAPASS
call thomas with any issues
pressure test Phone #: ###-#### Inspection requested via web by Nick Drake- 20lb gas pass
MEC17-02204 Final6/9/20176/12/20176/12/2017 10:29:03 AMAPASS
Please call Joanne or Don before arriving, thank you. Phone #: ###-#### Inspection requested via web by TERESA HUTTO
MEC17-02183 Rough-in6/11/20176/12/20176/12/2017 10:02:21 AMAPART
New square footage add on to be conditioned with Ductless mini split w dual heads/man j on site. Added venting for 2 bath fans and moved front room fireplace flue, re routed fire place flue from old exterior of house through the living room through roof. Phone #: ###-#### Inspection requested via web by dave sorensen- ok to cover- need to add mini split to permit (A/C) and pay fee- remove dryer exhaust from permit and use as other for rerouting fireplace flue before final inspection
MEC17-02247 Rough-in6/9/20176/12/20176/12/2017 8:59:19 AMAFAIL
CLINT ###-#### Phone #: ###-#### Inspection requested via web by Jason Robinson- need noncombustible hardy boardpr cement board installed per manufacture installation Fig 7