FIR17-00267
| INSP-Sprinkler Rough-in/Hydro | 6/12/2018 | 6/12/2018 | 6/12/2018 5:27:16 PM | P | PART |
|
|
Hydrostatic test for overhead fire sprinkler piping on level 1 witnessed, no pressure loss observed at riser provided gauge. Levels 2, 3, 4, 5 and standpipe to be completed at a later date.
Contact - Ken Orahood - ###-#### 30 min prior to Hydro Insp start on levels 1, 2 4 ; 5 please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00454
| INSP-Final Inspection | 6/12/2018 | 6/12/2018 | 6/12/2018 1:59:42 PM | P | CANC |
|
|
Fire alarms are not ready, fire alarm associated devices could no be tested, this inspection request is cancelled.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00095
| INSP-Final Inspection | 6/12/2018 | 6/12/2018 | 6/12/2018 1:59:11 PM | P | CANC |
|
|
Fire alarms are not ready, fire alarm associated devices could no be tested, this inspection request is cancelled.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00051
| INSP-Final Inspection | 6/12/2018 | 6/12/2018 | 6/12/2018 1:58:48 PM | P | CANC |
|
|
Fire alarms are not ready, fire alarm associated devices could no be tested, this inspection request is cancelled.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00316
| INSP-Sprinkler Rough-in | 6/11/2018 | 6/12/2018 | 6/12/2018 10:15:23 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover. Wood columns are exposed above the ceiling grid, columns will need to be covered in sheetrock above the ceiling or upright protection will be required to protect the combustible material. Columns issue will be verified at a later date.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00454
| INSP-Final Inspection | 6/12/2018 | 6/12/2018 | 6/12/2018 9:23:15 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
FIR18-00451
| INSP-Final Inspection | 6/11/2018 | 6/12/2018 | 6/12/2018 8:04:47 AM | A | PASS |
|
|
Final commercial hood fire suppression system inspection complete.
Dave Phone #: ###-####
|
FIR18-00451
| INSP-Sprinkler Rough-in/Hydro | 6/11/2018 | 6/12/2018 | 6/12/2018 8:03:12 AM | A | CANC |
|
|
Coordinated for 7AM with installing contractor.
|