BLD00-00953
| FIRE-Final Inspection | 6/12/2000 | 6/13/2000 | 6/13/2000 12:00:00 AM | A | FAIL |
|
|
Don, ###-#### Final fail C/N issued. 6/13/00 2:43:44 PM
|
BLD99-03469
| FIRE-Final Inspection | 6/12/2000 | 6/13/2000 | 6/13/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/12/2000 at 15:44:50. Contact: ###-####. Reinsp. ok for perm. occ. 6/13/00 2:43:35 PM
|
FIR00-00207
| INSP-Sprinkler Rough-in/Hydro | 6/9/2000 | 6/13/2000 | 6/13/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/09/2000 at 14:58:11. Contact: ###-####. OK on above & underground hydro tests. C/N issued on spklr. R/I 6/13/00 2:43:25 PM
|
BLD99-02317
| FIRE-Final Inspection | 6/12/2000 | 6/13/2000 | 6/13/2000 12:00:00 AM | P | FAIL |
|
|
mike ###-#### Final fail C/N issued. 6/14/00 8:59:47 AM
|
BLD99-02545
| FIRE-Final Inspection | 6/12/2000 | 6/13/2000 | 6/13/2000 12:00:00 AM | P | FAIL |
|
|
mike ###-#### Final fail C/N issued. 6/14/00 8:59:56 AM
|
BLD00-00897
| FIRE-Final Inspection | 6/13/2000 | 6/13/2000 | 6/13/2000 12:00:00 AM | P | PASS |
|
|
Dennis Harmond ###-#### Final ok for permanent occupancy 6/14/00 3:33:22 PM
|
FIR00-00346
| INSP-Sprinkler Rough-in/Hydro | 6/13/2000 | 6/13/2000 | 6/13/2000 12:00:00 AM | P | PART |
|
|
###-#### Ok on sprinkler R/I for hard lid areas only. 6/14/00 3:33:00 PM
|