BLD00-03519
| BLD-Final | 6/12/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | A | FAIL |
|
|
repair exit sign and move handrail in center stair to 34 to 38 inches . 6/13/2002 2:21:06 PM
|
BLD01-00000
| BLD-Final | 6/12/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | A | NR |
|
|
|
BLD01-000-1
| BLD-Final | 6/12/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | A | NR |
|
|
|
BLD01-00531
| BLD-Final | 6/12/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | A | NR |
|
|
|
BLD02-01117
| BLD-Footing | 6/12/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | A | PASS |
|
|
BEN ###-#### set back per apporved plan ft ok 6/13/2002 11:48:08 AM
|
BLD01-00230
| BLD-Final | 6/12/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | A | PART |
|
|
###-#### ###-####temp occ ok need to finsh exterior finshes. 6/18/2002 4:10:55 PM
|
BLD02-01037
| BLD-Framing/Rough-in | 6/12/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | P | PASS |
|
|
larry ###-#### fr
|
BLD00-03454
| BLD-Final | 6/10/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/10/2002 at 13:44:45. Contact: ###-####. no access called to set up a time no return call pm 6/18/02 6/18/2002 2:50:28 PM
|
MEC02-01550
| Final | 6/13/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 11:14:51. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/13/2002 at 11:19:39.
|
BLD02-00351
| BLD-Final | 6/13/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | P | CANC |
|
|
DENNIS ###-#### need fir insp first. 6/13/2002 2:22:12 PM
|
BLD02-00131
| BLD-Wall cover | 6/13/2002 | 6/13/2002 | 6/13/2002 12:00:00 AM | P | PASS |
|
|
###-#### dutch office walls ok for cover. 6/13/2002 2:23:58 PM
|