Inspections for the day of: Friday, June 13, 2003.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01071 BLD-Footing6/12/20036/13/20036/13/2003 12:00:00 AMAPART
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Work in progress,clean out some areas and support bar. 6/13/2003 10:23:15 AM
BLD03-01200 BLD-Foundation6/12/20036/13/20036/13/2003 12:00:00 AMAPASS
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore, bar at hds. 6/13/2003 10:23:27 AM
BLD02-01373 BLD-Wall cover6/12/20036/13/20036/13/2003 12:00:00 AMAPART
jim; Phone #: ###-#### Internet Inspection Request from: Barbara MooreOk to drywall inside except for the fire place needs A-flue piped and inspection, contractor on site with me said it will not be covered untill this has happened. 6/13/2003 12:35:59 PM 6/13/2003 12:37:34 PM 6/13/2003 4:54:45 PM
BLD03-00996 BLD-Footing6/12/20036/13/20036/13/2003 12:00:00 AMAPASS
kathy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD02-03001 BLD-Framing/Rough-in6/12/20036/13/20036/13/2003 12:00:00 AMPPART
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. They have called for shear again which has been approved by the special inspector, The engineer is on site now to address columns will give letter to contractor when complete. 6/13/2003 5:21:39 PMed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. They have called for shear again which has been approved by the special inspector, The engineer is on site now to address columns will give letter to contractor when complete. 6/13/2003 5:21:50 PM
BLD02-02473 BLD-Framing/Rough-in6/13/20036/13/20036/13/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 6/13/2003 at 7:54:01 AM. Contact: ###-####. need approval for at tp of walls no detail to maintain fire wall waiting for architect to address. also kitchen not yet ready. 6/13/2003 5:08:12 PM
BLD03-00127 BLD-Framing/Rough-in6/13/20036/13/20036/13/2003 12:00:00 AMPPART
###-#### . Need ok for the wood constructed awning. plans shown metal. 6/13/2003 3:31:01 PM
BLD02-01499 BLD-Framing/Rough-in6/13/20036/13/20036/13/2003 12:00:00 AMPFAIL
###-####. I have spoke with the engineer he said he had been out to advise them again, and had giver them letter for repairs. I see no letter on site and no special inspection report for any anchor bolt /hold downs, no approved plans, so I have posted a do not cover sticker. on window also with correction about the above. 6/13/2003 4:58:40 PM
BLD02-02999 BLD-Conference6/13/20036/13/20036/13/2003 12:00:00 AMPPART
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. They have called for shear again which has been approved by the special inspector, The engineer is on site now to address columns will give letter to contractor when complete. 6/13/2003 5:21:39 PMed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. They have called for shear again which has been approved by the special inspector, The engineer is on site now to address columns will give letter to contractor when complete. 6/13/2003 5:21:59 PM
BLD03-00783 BLD-Final6/12/20036/13/20036/13/2003 12:00:00 AMPFAIL
r.a schultz; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Needs smoke detectors per code and energy seal at ext boxes called contractor. 6/13/2003 2:33:36 PM