FIR06-00238
| INSP-Sprinkler Rough-in/Hydro | 6/13/2006 | 6/13/2006 | 6/14/2006 8:49:18 AM | P | NR |
|
|
Per contractor, the project is not ready for inspection at this time- to be rescheduled.
|
BLD05-02205
| FIRE-Final Inspection | 6/13/2006 | 6/13/2006 | 6/13/2006 3:24:52 PM | P | PASS |
|
|
Field inspection passed.
|
FIR06-00415
| INSP-Final Inspection | 6/13/2006 | 6/13/2006 | 6/13/2006 3:24:14 PM | P | FAIL |
|
|
Gas line not activated to facilitate proper testing of the hood suppression system.
|
BLD06-01335
| FIRE-Final Inspection | 6/12/2006 | 6/13/2006 | 6/13/2006 3:21:46 PM | A | DEFR |
|
|
Wrong inspection type called in. There is no project associated fire inspection required for this permit, notified contractor to request a structural inspection.
|
FIR06-00188
| INSP-Sprinkler Rough-in/Hydro | 6/12/2006 | 6/13/2006 | 6/13/2006 10:28:33 AM | A | PART |
|
|
Overhead rough-in for phase two of the project is acceptable for cover.
|