Inspections for the day of: Tuesday, June 13, 2006.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS06-00106 FIR-Final6/12/20066/13/20066/13/2006 4:23:00 PMPPASS
Life safety passed.
FIR06-00068 INSP-Sprinkler Rough-in/Hydro6/13/20066/13/20066/13/2006 3:54:34 PMPPASS
Overhead hydro test for the wet and dry systems passed. This included the FDC as well. Still need to do the 24 hour air test.
FIR05-00536 INSP-Sprinkler Rough-in6/13/20066/13/20066/13/2006 3:52:10 PMPPASS
Third floor sprinkler piping, except areas as marked on the plans, rough-in inspection has passed. Will need to be reinspected for hangers on arm overs prior to cover up.
FIR05-00693 INSP-Sprinkler Rough-in6/13/20066/13/20066/13/2006 2:42:40 PMPPASS
Piping located in the second floor north stairwell ceiling is ok to cover (three pendants)
FIR06-00120 INSP-Supply line flush6/9/20066/13/20066/13/2006 12:30:54 PMAPASS
Underground flush passed.
BLD05-03106 FIRE-Final Inspection6/12/20066/13/20066/13/2006 11:15:13 AMAFAIL
Proide exit discharge lighting as shown on sheet E.2, remove the thumbturn from the main exit. Keyed is ok. Provide sticker as well. Provide 1/2" thresholds at the doors as shown on the approved plans. Provide two fire extinguishers as discussed with current inspection tags in a normal path of travel at no higher than 48" above finish floor.
BLD06-00662 FIRE-Final Inspection6/12/20066/13/20066/13/2006 10:24:47 AMAPASS
Life safety finaled