MIS06-00106
| FIR-Final | 6/12/2006 | 6/13/2006 | 6/13/2006 4:23:00 PM | P | PASS |
|
|
Life safety passed.
|
FIR06-00068
| INSP-Sprinkler Rough-in/Hydro | 6/13/2006 | 6/13/2006 | 6/13/2006 3:54:34 PM | P | PASS |
|
|
Overhead hydro test for the wet and dry systems passed. This included the FDC as well. Still need to do the 24 hour air test.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 6/13/2006 | 6/13/2006 | 6/13/2006 3:52:10 PM | P | PASS |
|
|
Third floor sprinkler piping, except areas as marked on the plans, rough-in inspection has passed. Will need to be reinspected for hangers on arm overs prior to cover up.
|
FIR05-00693
| INSP-Sprinkler Rough-in | 6/13/2006 | 6/13/2006 | 6/13/2006 2:42:40 PM | P | PASS |
|
|
Piping located in the second floor north stairwell ceiling is ok to cover (three pendants)
|
FIR06-00120
| INSP-Supply line flush | 6/9/2006 | 6/13/2006 | 6/13/2006 12:30:54 PM | A | PASS |
|
|
Underground flush passed.
|
BLD05-03106
| FIRE-Final Inspection | 6/12/2006 | 6/13/2006 | 6/13/2006 11:15:13 AM | A | FAIL |
|
|
Proide exit discharge lighting as shown on sheet E.2, remove the thumbturn from the main exit. Keyed is ok. Provide sticker as well. Provide 1/2" thresholds at the doors as shown on the approved plans. Provide two fire extinguishers as discussed with current inspection tags in a normal path of travel at no higher than 48" above finish floor.
|
BLD06-00662
| FIRE-Final Inspection | 6/12/2006 | 6/13/2006 | 6/13/2006 10:24:47 AM | A | PASS |
|
|
Life safety finaled
|