BLD06-00577
| BLD-Framing/Rough-in | 6/13/2006 | 6/13/2006 | 6/13/2006 3:08:56 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Jay Story. Needs to brace partition walls as\ shown on plans. Demissing walls to go to structure.
|
BLD06-00576
| BLD-Framing/Rough-in | 6/13/2006 | 6/13/2006 | 6/13/2006 2:54:07 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Jay Story. Needs to brace walls as shown on plans. Demissing walls need to extend to underside of structure. ok to insulate.
|
BLD06-01375
| BLD-Framing/Rough-in | 6/13/2006 | 6/13/2006 | 6/13/2006 2:21:58 PM | P | PASS |
|
|
craig - sheer nailing insp also; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD05-03479
| BLD-Final | 6/13/2006 | 6/13/2006 | 6/13/2006 1:40:36 PM | P | FAIL |
|
|
JUD; Phone #: ###-#### nOTE: CALL FOR GARAGE OPENING Internet Inspection Request from: Cathy Chiles. Step required at doorway between R and U occ.
|
BLD05-03106
| BLD-Final | 6/9/2006 | 6/13/2006 | 6/13/2006 12:01:59 PM | A | NR |
|
|
Scheduled by a contractor via Hello! on 6/9/2006 at 4:34:54 PM. Contact: ###-####. Needs mech and life/safety finals.
|
BLD04-03025
| BLD-Framing/Rough-in | 6/12/2006 | 6/13/2006 | 6/13/2006 9:45:33 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/12/2006 at 7:24:33 AM. Contact: ###-####.ok to hang rock at rooms 3rd floor northwing. firecaulking and puttypads installed. ok to insulate rooms at 3rdfloor south wing.
|
BLD06-01174
| BLD-Concrete | 6/12/2006 | 6/13/2006 | 6/13/2006 9:07:20 AM | A | PART |
|
|
kevin - rebar; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Concrete columns, north side of bldg. Needs to clean out all dirt, tie wire, and rocks from bottom of column.
|
BLD06-01018
| BLD-Footing | 6/13/2006 | 6/13/2006 | 6/13/2006 8:48:43 AM | P | CANC |
|
|
not ready///blb Scheduled by a contractor via Hello! on 6/13/2006 at 7:14:55 AM. Contact: ###-####. Inspection cancelled from web by: Barbara Buckley
|