Inspections for the day of: Wednesday, June 13, 2007.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00727 INSP-Supply line flush6/12/20076/13/20076/14/2007 3:47:33 PMPPART
Completed UG fire supply line flush.
FIR07-00522 INSP-Final Inspection6/13/20076/13/20076/14/2007 11:21:39 AMPPASS
Fire sprinkler work completed satisfactory, permit finaled.
FIR06-00727 INSP-Sprinkler Rough-in/Hydro6/12/20076/13/20076/13/2007 4:42:20 PMPPART
4th floor rough-in is acceptable, noted two locations in need of hanger restraints and one pipe in excess of allowed deflection.
FIR07-00088 INSP-Final Inspection6/12/20076/13/20076/13/2007 4:40:33 PMPPASS
Fire alarm work passed field inspection, permit finaled.
FIR06-00989 INSP-Final Inspection6/12/20076/13/20076/13/2007 4:39:51 PMPPASS
Final fire sprinkler inspection passed.
FIR06-00007 INSP-Sprinkler Rough-in/Hydro6/8/20076/13/20076/13/2007 4:38:56 PMAPART
Tested a/v notification in the cleanroom areas-noted lacking coverage and overspaced devices at some locations, tested FACP batteries, AC loss, smoke at panel, manual pull stations for the basement and 1st floor tested okay, verified corrections at the basement from previous visit.
FIR06-00989 INSP-Sprinkler Rough-in/Hydro6/13/20076/13/20076/13/2007 3:39:22 PMPPART
AG hydrostatic test passed inspection.
FIR07-00193 INSP-Sprinkler Rough-in/Hydro6/8/20076/13/20076/13/2007 3:38:43 PMAPART
OH fire sprinkler rough-in is approved for cover at the drop ceiling areas.
FIR07-00019 FIR-Aging Inspection6/13/20076/13/20076/13/2007 1:01:04 PM DONE
Work in process.
FIR06-00540 INSP-Final Inspection5/30/20076/13/20076/13/2007 10:21:34 AMAPART
Completed satisfactory field acceptance testing per NFPA 20 for the fire pump and controller. Test report attached. SLR
BLD06-03197 FIRE-Final Inspection6/12/20076/13/20076/13/2007 10:19:41 AMANR
BLD final still pending related fire sprinkler permit final (need completion of 24 hr. air testing for the dry system).