FIR06-00727
| INSP-Supply line flush | 6/12/2007 | 6/13/2007 | 6/14/2007 3:47:33 PM | P | PART |
|
|
Completed UG fire supply line flush.
|
FIR07-00522
| INSP-Final Inspection | 6/13/2007 | 6/13/2007 | 6/14/2007 11:21:39 AM | P | PASS |
|
|
Fire sprinkler work completed satisfactory, permit finaled.
|
FIR06-00727
| INSP-Sprinkler Rough-in/Hydro | 6/12/2007 | 6/13/2007 | 6/13/2007 4:42:20 PM | P | PART |
|
|
4th floor rough-in is acceptable, noted two locations in need of hanger restraints and one pipe in excess of allowed deflection.
|
FIR07-00088
| INSP-Final Inspection | 6/12/2007 | 6/13/2007 | 6/13/2007 4:40:33 PM | P | PASS |
|
|
Fire alarm work passed field inspection, permit finaled.
|
FIR06-00989
| INSP-Final Inspection | 6/12/2007 | 6/13/2007 | 6/13/2007 4:39:51 PM | P | PASS |
|
|
Final fire sprinkler inspection passed.
|
FIR06-00007
| INSP-Sprinkler Rough-in/Hydro | 6/8/2007 | 6/13/2007 | 6/13/2007 4:38:56 PM | A | PART |
|
|
Tested a/v notification in the cleanroom areas-noted lacking coverage and overspaced devices at some locations, tested FACP batteries, AC loss, smoke at panel, manual pull stations for the basement and 1st floor tested okay, verified corrections at the basement from previous visit.
|
FIR06-00989
| INSP-Sprinkler Rough-in/Hydro | 6/13/2007 | 6/13/2007 | 6/13/2007 3:39:22 PM | P | PART |
|
|
AG hydrostatic test passed inspection.
|
FIR07-00193
| INSP-Sprinkler Rough-in/Hydro | 6/8/2007 | 6/13/2007 | 6/13/2007 3:38:43 PM | A | PART |
|
|
OH fire sprinkler rough-in is approved for cover at the drop ceiling areas.
|
FIR07-00019
| FIR-Aging Inspection | 6/13/2007 | 6/13/2007 | 6/13/2007 1:01:04 PM | | DONE |
|
|
Work in process.
|
FIR06-00540
| INSP-Final Inspection | 5/30/2007 | 6/13/2007 | 6/13/2007 10:21:34 AM | A | PART |
|
|
Completed satisfactory field acceptance testing per NFPA 20 for the fire pump and controller. Test report attached. SLR
|
BLD06-03197
| FIRE-Final Inspection | 6/12/2007 | 6/13/2007 | 6/13/2007 10:19:41 AM | A | NR |
|
|
BLD final still pending related fire sprinkler permit final (need completion of 24 hr. air testing for the dry system).
|