FIR05-00536
| INSP-Sprinkler Rough-in | 6/13/2007 | 6/13/2007 | 6/14/2007 3:42:29 PM | P | PASS |
|
|
See the city approved plans for the areas where piping can be covered.
|
BLD04-00941
| FIRE-Final Inspection | 6/13/2007 | 6/13/2007 | 6/13/2007 3:48:01 PM | P | PASS |
|
|
Life safety passed.
|
FIR07-00195
| INSP-Final Inspection | 6/13/2007 | 6/13/2007 | 6/13/2007 3:47:15 PM | P | PASS |
|
|
Permit finaled
|
FIR07-00155
| INSP-Sprinkler Rough-in | 6/13/2007 | 6/13/2007 | 6/13/2007 3:46:28 PM | P | DONE |
|
|
24 hr. pneumatic air test started at 12:50 with 44psi on the guage.
|
BLD07-00064
| FIRE-Conference | 6/12/2007 | 6/13/2007 | 6/13/2007 1:01:10 PM | A | DONE |
|
|
I went over hood suppression system requirements and fire extinguisher placement with the general contractor.
|
FIR07-00233
| INSP-Sprinkler Rough-in/Hydro | 6/12/2007 | 6/13/2007 | 6/13/2007 1:00:02 PM | A | PASS |
|
|
The above ground hydro test of both risers passed.
|