Inspections for the day of: Friday, June 13, 2008.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01088 BLD-Framing/Rough-in6/13/20086/13/20086/13/2008 4:40:43 PMPPASS
larry Phone #: ###-####
BLD08-00426 BLD-Final6/13/20086/13/20086/13/2008 4:24:34 PMPPASS
TOM Phone #: ###-####
BLD08-00426 DOC - Permit Finaled6/13/20086/13/20086/13/2008 4:24:25 PMPPASS
BLD08-00874 BLD-Framing/Rough-in6/12/20086/13/20086/13/2008 3:24:09 PMPPASS
Vicky Phone #: ###-####
Frame and energy OK
BLD07-01638 BLD-Footing6/13/20086/13/20086/13/2008 3:10:30 PMPPASS
cliff Phone #: ###-####
BLD08-00794 BLD-Conference6/12/20086/13/20086/13/2008 3:07:09 PMPDONE
Jeanna.....after 2:30
Need to fix stairs
BLD08-00840 BLD-Framing/Rough-in6/13/20086/13/20086/13/2008 3:06:37 PMPPASS
Don Phone #: ###-####
BLD08-00840 BLD-Energy code compliance6/13/20086/13/20086/13/2008 3:06:13 PMPPASS
Don Phone #: ###-####
BLD08-00575 BLD-Foundation6/13/20086/13/20086/13/2008 1:41:18 PMPPASS
Mark- founation wall Phone #: ###-####
ESC08-00215 Site Preparation6/13/20086/13/20086/13/2008 1:40:56 PMPPASS
Sign posted, Protection in nearest drain inlet.......Other drain should have solid lid? Paved area clean. Pouring found wall now.....Excavators forgot to dig pit for washout......washout in lowest area of lot ...talked to RP....Need to have washout pit in place prior to any concrete pours....advised Excavators.
BLD08-00813 BLD-Concrete6/12/20086/13/20086/13/2008 12:17:13 PMAPASS
Santos Phone #: ###-####