BLD07-02843
| BLD-Aging Inspection | 6/13/2008 | 6/13/2008 | 6/16/2008 1:22:18 PM | | PASS |
|
|
wip
|
BLD08-00445
| BLD-Aging Inspection | 6/13/2008 | 6/13/2008 | 6/16/2008 9:02:51 AM | | CANC |
|
|
exp on 9/08
|
BLD06-02303
| BLD-Other | 6/13/2008 | 6/13/2008 | 6/16/2008 9:01:39 AM | P | PART |
|
|
brad - ###-#### - close up inspection stair tower sheetrock floors 0-5 ok for second layer
|
BLD08-01028
| BLD-Framing/Rough-in | 6/12/2008 | 6/13/2008 | 6/13/2008 3:57:44 PM | P | PASS |
|
|
Dan Phone #: ###-#### ok to cover after elec r/i
|
BLD08-00739
| BLD-Framing/Rough-in | 6/13/2008 | 6/13/2008 | 6/13/2008 3:34:21 PM | P | PASS |
|
|
MARIO Phone #: ###-####
|
BLD08-01284
| BLD-Footing | 6/13/2008 | 6/13/2008 | 6/13/2008 2:29:17 PM | P | NR |
|
|
after 2 please--James ###-####
|
BLD08-00746
| BLD-Framing/Rough-in | 6/12/2008 | 6/13/2008 | 6/13/2008 11:13:04 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/12/2008 at 2:11:43 PM. Contact: ###-####. ok to cover
|
BLD08-01124
| BLD-Final | 6/12/2008 | 6/13/2008 | 6/13/2008 11:04:04 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/12/2008 at 3:35:23 PM. Contact: ###-####.ok for perm occ
|
MIS08-00095
| BLD-Conference | 6/12/2008 | 6/13/2008 | 6/13/2008 9:35:33 AM | A | PASS |
|
|
no work being done at this time that requiers a permit using land scaping block, walls are only 2 ft high and a 4ft fench around patio
|
BLD08-01113
| BLD-Other | 6/13/2008 | 6/13/2008 | 6/13/2008 8:04:50 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/11/2008 at 1:57:29 PM. Contact: ###-####.ceiling grid need to get other trades above grid oked also needs to clip or place spreader bars at ends
|
BLD08-01112
| BLD-Other | 6/13/2008 | 6/13/2008 | 6/13/2008 8:04:06 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/11/2008 at 1:56:09 PM. Contact: ###-####.ceiling grid need to get other trades above grid oked also needs to clip or place spreader bars at ends
|