BLD11-01185
| FIRE-Final Inspection | 6/10/2011 | 6/13/2011 | 6/13/2011 3:08:38 PM | P | FAIL |
|
|
See the city approved plans for a list of items that need addressed. They include providing approved single action hardware on all doors as per the approved plans, removing all of the dead bolts, mounting the fire extinguishers as discussed and contacting Tim Woodard with plan review about the woodworking utilizing roughly 50% of the ware house instead of the 10% noted on the approved plans.
|
FIR11-00151
| INSP-Final Inspection | 6/13/2011 | 6/13/2011 | 6/13/2011 2:23:44 PM | P | FAIL |
|
|
No inspection was performed due to the plans not matching the installation. Instead of the AES being mounted at the FACP in the basement the AES has been mounted on the 7th floor and is being activated by relays. Plans need to be resubmitted showing the actual wiring and installation method.
|
FIR11-00205
| INSP-Final Inspection | 6/9/2011 | 6/13/2011 | 6/13/2011 10:32:54 AM | A | PASS |
|
|
Permit finaled
|
FIR11-00218
| INSP-Final Inspection | 6/9/2011 | 6/13/2011 | 6/13/2011 10:32:37 AM | A | PASS |
|
|
Permit finaled
|
FIR11-00150
| INSP-Final Inspection | 6/9/2011 | 6/13/2011 | 6/13/2011 10:31:48 AM | A | PASS |
|
|
Permit finaled
|